#TBD : 34441533
16 Days Left
Power Plant
Uttaranchal
Ref. Document
Due on : 26 May, 2025
Design, Reverse Engineering, Manufacturing, Supply, Transportation, Installation, Testing & Commissioning Of A Compact Oil Pressure Unit (opu) For Both The Units Of Pilangad Ljd (2×1125kv)
#TBD : 34419871
3 Days Left
Power Plant
Uttaranchal
28.00 Lacs
Due on : 13 May, 2025
Hiring Of One Number 26 Plus1 Seater Bus For Tiloth Power House Uttarkashi Works
#TBD : 34441523
16 Days Left
Power Plant
Uttaranchal
18.60 Lacs
Due on : 26 May, 2025
Purchase Of Necessary Spare Parts Of Turbine Control Panel (tcp), Automatic Voltage Regulator (avr) Panel And Transformer Relay Metering Panel Etc
#TBD : 34432888
20 Days Left
Power Plant
Uttaranchal
Ref. Document
Due on : 30 May, 2025
Extension Of Bay At 132kv Switchyard At Kulhal Power Station
#TBD : 34427122
5 Days Left
Power Plant
Uttaranchal
24.90 Lacs
Due on : 15 May, 2025
Overhauling Of 34 Mva, 11/220 Kv Generator Transformer Of Unit No. 2 At Khodri Power House Along With Dry Out And Vacuumization Work Of Transformer
#TBD : 34428067
0 Days Left
Power Plant
Uttaranchal
6.84 Lacs
Due on : 09 May, 2025
Felling Of Trees Located On Both Sides Of Shakti Canal From New Colony Dakpathar To Steel Bridge For 2.50 Mw Solar Plant
#TBD : 34428516
0 Days Left
Power Plant
Uttaranchal
6.84 Lacs
Due on : 09 May, 2025
Work Of Felling Of Trees Located On Both Sides Of Shakti Canal For 2.50 Mw Solar Plant From New Colony Dakpathar To Steel Bridge
#TBD : 34427339
6 Days Left
Power Plant
Uttaranchal
19.97 Lacs
Due on : 16 May, 2025
Maintenance And Cleaning Work Of Annual Gardening Of Cheela Power House Premises
#TBD : 34438696
9 Days Left
Power Plant
Uttaranchal
10.81 Lacs
Due on : 19 May, 2025
Construction Work Of Footpath For The Cremation Ground Of Chunni Village, Affected By Madhmeshwar Ljv Project (3x5 Mw)
#TBD : 34427370
3 Days Left
Power Plant
Uttaranchal
4.90 Lacs
Due on : 13 May, 2025
Work Of Operating 01 No. Of Non-ac Diesel Vehicle