#TBD : 35003844
0 Days Left
Power Plant
Telangana
5.61 Lacs
Due on : 04 Aug, 2025
Periodical/preventive And Breakdown Maintenance Works Of 11kv And 3.3 Kv Ht Switchgear, Breaker And Cable Connections To Ht Motors Of Unit-1, Unit-2, Ahp And Bop Area As And When Required For The Year 2025-26 For Stage-i.
#TBD : 35004333
0 Days Left
Power Plant
Telangana
44.45 Lacs
Due on : 04 Aug, 2025
Construction Of Dormitories And Repairs To Existing Kgbv Building At Kammapally Vm
#TBD : 35010276
16 Days Left
Power Plant
Telangana
9.56 Lacs
Due on : 20 Aug, 2025
Supply Of Pneumatic Actuators And Seal Kits Of Emerson Make In Bop Area
#TBD : 35009021
4 Days Left
Power Plant
Telangana
3.47 Lacs
Due on : 08 Aug, 2025
Marshalling Yard-deep Screening, Lifting And Packing And Spreading Of Railway Track Ballast In Lead Line From P/c No.-102 To P/c No.700 At In Haul Side In The Marshalling Yard Of Ktps-vii Stage.
#TBD : 35008916
1 Days Left
Power Plant
Telangana
43.33 Lacs
Due on : 05 Aug, 2025
Providing Rcc Road Across Rail Track No.8 To 12 At Wagon Tippler 1 And 2 Area Of 5x800mw Yadadri Thermal Power Station, Veerlapalemv, Dameracherlam
#TBD : 35008665
14 Days Left
Power Plant
Telangana
2.61 Crore
Due on : 18 Aug, 2025
Construction Of Two Lane Rcc Road Bridge Across The Natural Stream Near R10 Area At Btps4x270mw
#TBD : 35009984
0 Days Left
Power Plant
Telangana
14.38 Lacs
Due on : 04 Aug, 2025
Maintenance Works Of Lt Switchgear Of Unit-1, Unit-2, Ahp And Bop Area As And When Required For The Year 2025-26 For Stage-i.
#TBD : 35003771
22 Days Left
Power Plant
Telangana
16.9 Thousand
Due on : 26 Aug, 2025
Supply Of Parker Hannifin Make Oil Hoses For Hp Bypass System Of Ktpp, Stage-ii 1x600 Mw Unit
#TBD : 35004993
10 Days Left
Power Plant
Telangana
9.53 Lacs
Due on : 14 Aug, 2025
Tggenco-ytps5x800 Mw-bop-ahp-unit#1-manual Collection And Transporattion Of Wet, Dry Ash And Debries Mixed With Ash Etc. At The Esp Hoppers Area, Bottom Ash Hoppers Area, Aph And Duct Hoppers, Economizer Hoppers, Scr Hoppers, Ash Slurry Pump House Area, Silo Area, Boiler Surroundings, Including All Drains And All Drain Sumps And Other Areas Of Ash Handling Palnt/ Unit#1/stage-i/ytps To Ash Pond /dump Yard For A Period From The Actual Date Of Commencement To 31.03.2026.
#TBD : 35005192
16 Days Left
Power Plant
Telangana
4.53 Lacs
Due on : 20 Aug, 2025
Supply Of Exide Make 2250 Ah, Yhp 43 Positive And Negative End Model Lead Acid Plante Type Spare Batteries Used In 220v Dc Battery Banks