#TBD : 31555755
0 Days Left
Water Supply And Drainage
Tamil Nadu
Ref. Document
Due on : 08 Apr, 2024
Permanent Restoration Works In Cwss To 637 Habs. In Virudhunagar Dist
#TBD : 31527849
0 Days Left
Water Supply And Drainage
Tamil Nadu
6.95 Crore
Due on : 26 Mar, 2024
Permanent Restoration Works In The 20 Mgd Water Supply Scheme In Thoothukudi District Due To Nem Flood Occurred In River Tamirabarani
#TBD : 31555803
0 Days Left
Water Supply And Drainage
Tamil Nadu
Ref. Document
Due on : 08 Apr, 2024
Permanent Restoration Works In Cwss To Kayathar In Thoothukudi Dist
#TBD : 31527471
0 Days Left
Water Supply And Drainage
Tamil Nadu
4.61 Crore
Due on : 26 Mar, 2024
Permanent Restoration Works In The Sawyerpuram And Perungulam And Sathankulam Cwss In Thoothukudi District Due To Nem Flood Occurred In River Tamirabarani
#TBD : 31552956
0 Days Left
Water Supply And Drainage
Tamil Nadu
41.40 Crore
Due on : 22 Apr, 2024
Providing Water Supply Scheme To Tdm Sipcot
#TBD : 31552913
0 Days Left
Water Supply And Drainage
Tamil Nadu
4.60 Crore
Due on : 08 Apr, 2024
Providing Water Supply Scheme To Pkm Sipcot
#TBD : 31527463
0 Days Left
Water Supply And Drainage
Tamil Nadu
Ref. Document
Due on : 26 Mar, 2024
Permanent Restoration Works In Cwss To 7 Tp In Virudhunagar District.
#TBD : 31535834
0 Days Left
Water Supply And Drainage
Tamil Nadu
44.00 Crore
Due on : 17 Apr, 2024
Providing 3 20 Mld Water Supply To Sipcot Industrial Park At A Sathanur In Ulundurpettai Taluk Of Kallakurichi District By Tapping From Wss To Advanced Institute For Integrated Research On Livestock And Animal Sciences Aiirlivas At Thalaivasal Koot
#TBD : 31527476
0 Days Left
Water Supply And Drainage
Tamil Nadu
9.41 Crore
Due on : 26 Mar, 2024
Permanent Restoration Works In The Cwss To Shenkottai Municipality In Tenkasi District Due To Nem Flood Occurred In River Tamirabarani
#TBD : 31543754
0 Days Left
Water Supply And Drainage
Tamil Nadu
2.46 Crore
Due on : 04 Apr, 2024
Replacement Of Existing Various Pipes With New 600Mm Di K7 400Mm Di K7 160 Hdpe Pn Class 6 Pipes Of Total Length Of 2490M Near Muthampatty Railway Cross Lc 159 For Construction Of Rob From Km 24 3 To 25 4 Nh 79 Salem To Ulunthurpet By Highway Dept