#TBD : 34697801
0 Days Left
Construction
Gujarat
1.14 Crore
Due on : 15 Jul, 2025
Resurfacing And Strengthening To Kamrej Service Road Of N.h.-48 Starting From 0/000 Shrushti Complex, Kamrej Char Rasta To 1/000 Kholvad Village, Kamrej Under Suda Area.
#TBD : 34697206
0 Days Left
Construction
Gujarat
30.43 Lacs
Due on : 07 Jul, 2025
Construction Of Box Culvert On Canal Madhuram Circle To Karadava Road Near Ghyanmanjari School In Surat Urban Development Authority Area.
#TBD : 34697362
0 Days Left
Construction
Gujarat
13.27 Crore
Due on : 25 Jul, 2025
Construction Of 7.00 Mt Wide Flexible Pavement On Lhs Side Of Udhna Minor Canal Road Starting From Bullet Train Road Junction 0/000 To Smc Limit, Godadara 5/250 Under Suda Area.
#TBD : 34697462
0 Days Left
Construction
Gujarat
46.58 Lacs
Due on : 07 Jul, 2025
Construction Of Flexible Pavement Of 7.00mt Wide Road In 18 Mt And 10.5 Mt T.p Road From Block No-145 To 144/p In T.p40navagam In Suda Area.
#TBD : 34697685
0 Days Left
Construction
Gujarat
16.62 Lacs
Due on : 07 Jul, 2025
Supply Installation And Commissioning Of Led Street Light From Vrundavan Society Sachin To Vanz Village Site Upto Nh- 53palsana-hazira Road Limit. 2x7mtr Road, 0.40 Km Long, 9mtr Ht. Pole Single Centre Side.
#TBD : 34697734
0 Days Left
Construction
Gujarat
3.04 Crore
Due on : 25 Jul, 2025
Construction Of Canal Protection Wall On Rhs Side Of Udhna Minor Canal Road Starting From N.h.-48, Chalthan 0/000 To Smc Limit, Godadara 8/500 Under Suda Area.
#TBD : 34697781
0 Days Left
Construction
Gujarat
29.87 Lacs
Due on : 07 Jul, 2025
Supply Installation And Commissioning Of Led Street Light Atmalgama Village Limit From Railway Track Smc Limit To Malgama Village Limit . 7mtr Road, 1.8 Km Long, 7mtr Pole Single Side
#TBD : 34697659
0 Days Left
Construction
Gujarat
1.66 Crore
Due on : 15 Jul, 2025
Construction Of Flexible Pavement Of 7.00mt In 24 Mt T.p Road Of T.p Scheme No-48 Kholvad From Block No-176p To 94 In Surat Urban Development Authority Area.
#TBD : 35146531
9 Days Left
Construction
Gujarat
47.99 Lacs
Due on : 01 Sep, 2025
Repair And Renovation Work For Existing Street Light On Both Side Of Kumbhariya To Kadodara Road Under Suda Jurisdiction.
#TBD : 34697180
0 Days Left
Construction
Gujarat
43.10 Lacs
Due on : 07 Jul, 2025
Supply Installation And Commissioning Of Led Street Light From Phc Centre Of Talodara Main Road To Talodara Village Site Internal Road Limit. 7mtr Road, 1.80 Km Long, 7mtr Pole Ht.single Side Of Road