#TBD : 34959374
0 Days Left
Water Supply And Drainage
Goa
6.68 Crore
Due on : 08 Aug, 2025
Gis Mapping And Data Collection Of Sewer Lines, And Their Respective Manholes In Ponda And Surrounding Areas
#TBD : 34766296
0 Days Left
Water Supply And Drainage
Goa
4.77 Crore
Due on : 14 Jul, 2025
Providing House Sewer Connections Departmentally To The Left Out Areas Of Mandopa, Dongorim, Rosary College, Buticas, Nagmodem And Its Surrounding Areas In Navelim Constituency.
#TBD : 34959350
0 Days Left
Water Supply And Drainage
Goa
4.97 Crore
Due on : 08 Aug, 2025
Construction Of Balance Works Of Intermediate Pumping Station No 8 At Durgawadi In Taleigao Constituency.
#TBD : 34766466
0 Days Left
Water Supply And Drainage
Goa
5.88 Crore
Due on : 11 Jul, 2025
Oandmof 6.7 Mld .. Stp At Madgaon..raw Sewage Ps At Navelim For A Period Of 3 Years Inclu. Cost Of Material, Recti. Of Def., Replac.of Damaged, Def. Parts Of The Machinery, Equip. ..cost Of Lubricants, Oil, Maint. Aesthetic View Of The Premises..tidy
#TBD : 34959382
0 Days Left
Water Supply And Drainage
Goa
24.95 Lacs
Due on : 08 Aug, 2025
Urgent Repair And Maintenance Work Of Pump House Dry Welll At Shirvodem, Margao Sewage Treatment Plant.
#TBD : 34959384
0 Days Left
Water Supply And Drainage
Goa
7.65 Crore
Due on : 08 Aug, 2025
Designing, Development, Installation, Testing And Commissioning Of Smart Sewage Tanker Tracking System And Centralised Command Centre Including Operation And Maintenance Of The Entire System For 18 Months
#TBD : 34890186
0 Days Left
Water Supply And Drainage
Goa
75.57 Crore
Due on : 08 Aug, 2025
Revamping Of 7.5 Mld Activated Sludge Process Stp To 20 Mld Stp Based On Sbr Technology Followed By Operation And Maintenance For 2 Year At Shirvodem Margao Goa
#TBD : 34766845
0 Days Left
Water Supply And Drainage
Goa
5.27 Crore
Due on : 18 Jul, 2025
Design, Construction, Supply, Erection, Testing And Commissioning Of Tertiary Treatment By Disc Filter System For 5.6 Mld Capacity Stp At Baga Including Comprehensive O And M For 3 Years
#TBD : 34766856
0 Days Left
Water Supply And Drainage
Goa
2.94 Crore
Due on : 18 Jul, 2025
Design, Construction, Supply, Erection, Testing And Commissioning Of Tertiary Treatment By Sand And Carbon Filter System For 2 Mld Capacity Stp At Patto Including Comprehensive O And M For 3 Years
#TBD : 34959320
0 Days Left
Water Supply And Drainage
Goa
4.77 Crore
Due on : 08 Aug, 2025
Maintenance Of Sewage Pumping Stations In And Around Panaji City For The Year 202526