#TBD : 35218992
1 Days Left
Power
Rajasthan
11.60 Lacs
Due on : 28 Aug, 2025
Requirement Of Insulating Mats For Electrical Panels At Ht Lt Switchgear Rooms At 2x660 Mw Stps Sc Unit No. 7 And 8 Suratgarh
#TBD : 35207856
5 Days Left
Power
Rajasthan
91.30 Lacs
Due on : 01 Sep, 2025
Supply Of Rexroth Make Hydraulic Pumps And Servo Valves For Various Equipment Installed At Ctpp, Chhabra
#TBD : 35206746
14 Days Left
Power
Rajasthan
14.18 Lacs
Due on : 10 Sep, 2025
Supply Of Contact Resistance Meter And Automatic Primary Injection Test Set For Kstps
#TBD : 35206958
2 Days Left
Power
Rajasthan
2.46 Crore
Due on : 29 Aug, 2025
Procurement Of Spares For M/s L And T Construction And Equipment Limited Hydraulic Division Make Equipments At Chp, Csctpp, Chhabra
#TBD : 35206556
14 Days Left
Power
Rajasthan
Ref. Document
Due on : 10 Sep, 2025
Requirement Of Indure Make Spares For Ash Handling System Of Unit 5 And 6 2X660mw, Csctpp, Rrvun, Chhabra.
#TBD : 35207080
14 Days Left
Power
Rajasthan
15.84 Lacs
Due on : 10 Sep, 2025
Supply Of 198 Kv, Staion Class, Gapless Type, Metal Oxide Lighting Arrester La For Kstps
#TBD : 35207460
2 Days Left
Power
Rajasthan
Ref. Document
Due on : 29 Aug, 2025
Supply Of Elastomer Based Knife Gate Valves And Spares For Ash Slurry Pump House U 6 And 7 And Bottom Ash Hopper System Unit 6 Through Oem Ms Energo Products Ltd. New Delhi At Kstps, Rvunl
#TBD : 35207074
14 Days Left
Power
Rajasthan
19.82 Lacs
Due on : 10 Sep, 2025
Supply Of Various Type Of Adhesive To Kstps, Kota Tn-25141
#TBD : 35219035
2 Days Left
Power
Rajasthan
78.02 Lacs
Due on : 29 Aug, 2025
Supply And Application Of Insulation In Boiler And Turbine Area Of Stage I To V, Kstps,
#TBD : 35208024
1 Days Left
Power
Rajasthan
Ref. Document
Due on : 28 Aug, 2025
Supply Of Spares For Flowmore Make Various Pumps Installed In Cam Circle And Ahpm Circle Of Ktps