#TBD : 34301640
0 Days Left
Building Work
Orissa
85.00 Lacs
Due on : 11 Apr, 2025
Construction Of Compound Wall Using Sfrc Slab At Ransinghpur Phase Ii Ac.12.84
#TBD : 34798012
0 Days Left
Building Work
Orissa
47.03 Lacs
Due on : 18 Jul, 2025
Supply Installation Commissioning Testing And Inspection Of Two Nos Of Ten Passenger Lift To Head Office Building Oshb With Dismantling And Buyback The Existing Lifts And Comprehensive Maintenance Contract For 03 Years
#TBD : 34301771
0 Days Left
Building Work
Orissa
90.00 Lacs
Due on : 11 Apr, 2025
Construction Of Compound Wall Using Sfrc Slab At Suango Ac.17.00
#TBD : 34786950
0 Days Left
Building Work
Orissa
1.52 Crore
Due on : 22 Jul, 2025
External Electrification Works To Plotted Development Scheme
#TBD : 34301835
0 Days Left
Building Work
Orissa
17.50 Lacs
Due on : 11 Apr, 2025
Construction Of Sfrc Compound Wall For Protection Of Oshb Vacant Land
#TBD : 34621216
0 Days Left
Building Work
Orissa
1.52 Crore
Due on : 25 Jun, 2025
External Electrification Works To Plotted Development Scheme At Jagannath Prasd Bhubaneswa External Electrification Works To Plotted Development Scheme At Jagannath Prasd
#TBD : 34982135
0 Days Left
Building Work
Orissa
47.03 Lacs
Due on : 05 Aug, 2025
Supply Installation Commissioning Testing And Inspection Of Two Nos Of Ten Passenger Lift To Head Office Building Oshb Bhubaneswar With Dismantling And Buyback The Existing Lifts And Comprehensive Maintenance Contract For 03 Years
#TBD : 32932311
0 Days Left
Building Work
Orissa
49.31 Lacs
Due on : 08 Oct, 2024
Installation Of Basement Lobby And Lift Well Pressurization Work With Fire Resistance Door At Fire Exit Staircase Of All Floors In Connection With Fire Fighting System Of B Plus G Plus12 Storied Residential Apartment Kharavela Enclavejagamara Bbsr
#TBD : 35243856
8 Days Left
Building Work
Orissa
47.03 Lacs
Due on : 09 Sep, 2025
Supply, Installation, Commissioning, Testing And Inspection Of 02 Nos Of 10 Passenger Lift To Head Office Building, Oshb, With Dismantling And Buyback The Existing Lifts And Comprehensive Maintenance Contract, Cmc For A Period Of 03 Years
#TBD : 34301425
0 Days Left
Building Work
Orissa
35.00 Lacs
Due on : 11 Apr, 2025
Construction Of Compound Wall Using Sfrc Slab