#TBD : 35168582
15 Days Left
Civil Work
Manipur
9.80 Crore
Due on : 09 Sep, 2025
Improvement Of Existing Road To 2 L Of Maram Peren Section Package1b, From Design Chainage 22.340 Km To 40.00 Km On Nh129a In The State Of Manipur Balance And Rectification Works On Item Rate At The Risk And Cost Of The Epc Contractor
#TBD : 35161627
9 Days Left
Civil Work
Assam
9.94 Crore
Due on : 03 Sep, 2025
One Time Improvement Of The Existing Road From 550.350 To Ch 561.500 Passing Through Moran Town Of Nh-37 New Nh- 02 On Item Rate Basis In The State Of Assam In Fy- 25-26 Ro-As/Dib/Oti/Morantwn/25-26/1
#TBD : 35156620
0 Days Left
Civil Work
Manipur
8.39 Crore
Due on : 23 Aug, 2025
Short Term Maintenance Contract Stmc Of Mao To Senapati Road Nh02 From Existing Chainage Km 212.325 To Km 235.400 In The State Of Manipur In The Year 2025 26 Nhidcl/Ro-Imphal/Stmc/Nh02/25
#TBD : 35156933
14 Days Left
Civil Work
Nagaland
8.71 Crore
Due on : 08 Sep, 2025
Short Term Maintenance Contract For Restoration Of Hill Slope From Km Ch. 161.120 To Km Ch. 161.220 At 4-Laning Of Dimapur-Kohima Section Nh-29 In The State Of Nagaland In Fy 2025-26 Percentage Rate And Work Order Basis Stmc For Restoration Of Hill Slope From Km Ch. 161.120 To Km Ch. 161.220 At 4-Laning Of Dimapur-Kohima
#TBD : 35156514
3 Days Left
Civil Work
Delhi
Ref. Document
Due on : 28 Aug, 2025
Consultancy Services As Ae For Supervision Of Construction Of Two Lane With Paved Shoulders Road From Tamenglong To Mahur Nh-137 In The State Of Manipur Package-5 And 6 On Epc Mode. Nhidcl/manipur/ 2020-21/ae/tmp56
#TBD : 35156773
0 Days Left
Civil Work
West Bengal
58.14 Lacs
Due on : 25 Aug, 2025
Widening Of Valley Side At Km 20.900, Km 35.500 And Km 36.700 And Culvert At 13 Locations Viz. Km 17.600, Km 17.800, Km 18.300, Km 20.200, Km 21.500, Km 21.650, Km 21.850, Km 32.800, Km 33.100, Km 38.300, Km 40.300, Km 43.700, Km 47.300 On Nh-10epc Nhidcl/hq/wb/rang-sev/wvc/2025
#TBD : 35161116
8 Days Left
Civil Work
Assam
Ref. Document
Due on : 02 Sep, 2025
Ie Services For 4 - Laning Of Silchar Near Budha Nagar At Existing Km 233.000 D. Ch.24.560 To Jiribam At Existing Km 212.060 D. Ch. 37.650 Of Nh- 37 Length- 13.09 Km In The State Of Assam And Manipur Under Nho-ne On Ham Pkg-2
#TBD : 35162142
9 Days Left
Civil Work
Assam
9.94 Crore
Due on : 03 Sep, 2025
One Time Improvement Of The Existing Road From 550.350 To Ch 561.500 Passing Through Moran Town Of Nh-37 New Nh- 02 On Item Rate Basis In The State Of Assam In Fy- 25-26
#TBD : 35114320
1 Days Left
Civil Work
Manipur
2.49 Crore
Due on : 26 Aug, 2025
Short Term Improvement And Routine Maintenance Of Finch Corner Kaziphung Ukhrul Road Section Of Nh 202 From Existing Km 522.860 To Km 538.730 Total Length 15.87 Km Pkg-03 In The State Of Manipur On Item Rate Basis In The Fy25-26 3rd Call
#TBD : 35091272
5 Days Left
Civil Work
Tripura
50.04 Crore
Due on : 30 Aug, 2025
R R Through Stmc Work Of Nh 08 From Km 6.8 To Km 55 Of Agartala To Udaipur Section Length 45.85 Km In The State Of Tripura In Fy 2025-26 On Percentage Basis And Work Order Basis