#TBD : 35147766
0 Days Left
Construction
Uttar Pradesh
23.89 Lacs
Due on : 23 Aug, 2025
Work Of Strengthening Of Lighting System On 12m Wide Sector Roads Of Sector-04
#TBD : 35062713
0 Days Left
Construction
Uttar Pradesh
10.08 Lacs
Due on : 12 Aug, 2025
Completion, Installation And Writing Of Pr In Prescribed Format For Information Board To Be Installed In Front Of Illegal Plotting In Various Enforcement Zones Of Moradabad Development Area.
#TBD : 35120545
0 Days Left
Construction
Uttar Pradesh
Ref. Document
Due on : 23 Aug, 2025
Architectural Request For Proposal Rfp For Empanelment For Architectural, Engineering, Landscaping, Urban Development And Planning Firms For Upcoming Mda Schemes
#TBD : 35101007
0 Days Left
Construction
Uttar Pradesh
Ref. Document
Due on : 23 Aug, 2025
Land Audit Request For Proposal Rfp For Hiring Of Consultant For Land Auditing And Inventory Management
#TBD : 35105680
0 Days Left
Construction
Uttar Pradesh
Ref. Document
Due on : 18 Aug, 2025
Request For Proposal For The Development, Operation And Maintenance Of Moradabad Urban Vista Zero Point Plaza Development And Media Rights Along Delhi Road, Rampur Road And New
#TBD : 35092600
7 Days Left
Construction
Uttar Pradesh
2.19 Crore
Due on : 30 Aug, 2025
Construction Work Of 12.00 M Wide Road From Point 19 To 19a Under Industrial Circulation Scheme On The Land Of Village Veerpur And Dhimari Adjoining Delhi-bareilly National Highway Nh-09.
#TBD : 35066778
0 Days Left
Construction
Uttar Pradesh
5.44 Lacs
Due on : 12 Aug, 2025
Horticulture Work 1- Planting Of 4200 Saplings Using Miyawaki Study In The Park In Front Of Plot F-27 In Sector-12 Of Naya Moradabad Yojana And Their Conservation For 02 Years.
#TBD : 35059822
0 Days Left
Construction
Uttar Pradesh
1.51 Crore
Due on : 16 Aug, 2025
Repair Of Boundary Wall Around The Staff Building Constructed In Sector-06 Of Naya Moradabad Yojna, Installation Of Pr Grill, Covering Of Drains, Interlocking Tiles, Kota Stone Flooring And Work Of Missing/damaged Sewer Line Population.
#TBD : 35149240
0 Days Left
Construction
Uttar Pradesh
98.60 Lacs
Due on : 23 Aug, 2025
Work Of Installation Of High Mast And Electric Poles Of Various Sectors And Indicator Signage Board Per Sector
#TBD : 35008086
0 Days Left
Construction
Uttar Pradesh
12.66 Lacs
Due on : 08 Aug, 2025
External Electrification Work For The Plots To Be Developed As Per The Newly Planned Tall Map Of The Remaining Part Of Ekta Vihar South Scheme Developed