#TBD : 34447967
0 Days Left
Construction
Haryana
Ref. Document
Due on : 09 May, 2025
Consultancy Services For Preparation Of Detailed Project Report Dpr For Upgradation Of Existing 2 Lane Road To 4 Lane Road Connecting Sector 23-25 Dividing Road And Leading Towards Nh-07
#TBD : 35131347
1 Days Left
Construction
Haryana
86.88 Crore
Due on : 25 Aug, 2025
Construction Of 30 Mld Stp Based On Sbr Technology In The Existing Premises Of Already Constructed 30 Mld Stp At Rathdhana, Sonipat Construction Of 30 Mld Stp Based On Sbr Technology In The Existing Premises Of Already Constructed 30 Mld Stp At Rath
#TBD : 35032531
0 Days Left
Construction
Maharashtra
Ref. Document
Due on : 18 Aug, 2025
Request For Proposal Rfp For Appointment Of Consultant For The Study, Analysis And Mapping In Gis Of The Physical And Socio Economic Infrastructure Within The Villages Of Csmr
#TBD : 34942280
0 Days Left
Construction
Haryana
95.35 Lacs
Due on : 05 Aug, 2025
Special Repair Of Sectors- 8/9 Assets Id-110033 And Sectors 9/10 Assets Id-110035 Dividing Road, Panchkula Including Three Year Of Defect Liability Period Free Of Cost Special Repair Of Sectors- ...
#TBD : 35150275
0 Days Left
Construction
Haryana
10.39 Lacs
Due on : 20 Aug, 2025
Annual Maintenance Of Pumping Machinery And Operation Of Disposal At Sector 64 Tdi Sonipat And All Other Works Contingent Thereto Under Smda Sonipat
#TBD : 35197025
1 Days Left
Construction
Haryana
Ref. Document
Due on : 25 Aug, 2025
Annual Maintenance And Desilting Of Various Dia Sewer Line Repair And Replacement Of Manhole Cover And Frame Casting Of Damaged Slab And All Other Works Contingent Thereto Under Smda Sonipat
#TBD : 34435824
0 Days Left
Construction
Maharashtra
Ref. Document
Due on : 30 May, 2025
Appointment Of Consultant For Preparation Of Feasibility Study Report , Detailed Project Report And Fixation Of Alignment For Palkhi Marg
#TBD : 35150633
4 Days Left
Construction
Haryana
Ref. Document
Due on : 28 Aug, 2025
Request For Proposal For Engagement Of Consultant For Detailed Study Of Existing Drainage Schemes And Preparation Of Concept Drainage Plan For Smda Urban Area Including Suggesting Short Term And Long-term Measures Required To Be Taken
#TBD : 34427065
0 Days Left
Construction
Maharashtra
Ref. Document
Due on : 30 May, 2025
Appointment Of Consultant For Preparation Of Feasibility Study Report, Detailed Project Report And Fixation Of Alignment For Palkhi Marg From Nashik To Trimbakeshwar In Nmrda Jurisdiction. Palkhi Marg
#TBD : 35131959
0 Days Left
Construction
Haryana
12.41 Crore
Due on : 18 Aug, 2025
Dpr For Providing Sewerage Network And Sewage Treatment Plant Of 7.50 Mld