#TBD : 35163653
16 Days Left
Railway Transport
Maharashtra
95.50 Crore
Due on : 08 Sep, 2025
Modification Of 110 Kv/220kv Ehv D/c Overhead Lines At A. Ch-11350m Near Patlipada Flyover Junction, B. Ch-14050m Near Waghbil Station And C. Ch-20950 Between Balkum Naka To Balkum Pada Station, For Thane Integral Ring Metro Project.
#TBD : 34975339
0 Days Left
Railway Transport
Maharashtra
Ref. Document
Due on : 05 Aug, 2025
Detailed Design Consultancy Services For 14 Fourteen Elevated Stations Viz. Kharadi Chowk Dandekar Pul, Excluding Viaduct In Station Portion On Kharadi Khadakwasla Corridor Of Pune Metro Rail Project.
#TBD : 35083445
16 Days Left
Railway Transport
Maharashtra
95.50 Crore
Due on : 08 Sep, 2025
Modification Of 110 Kv/220kv Ehv D/c Overhead Lines At A. Ch-11350m Near Patlipada Flyover Junction, B. Ch-14050m Near Waghbil Station And C. Ch-20950 Between Balkum Naka To Balkum Pada Station, For Thane Integral Ring Metro Project.
#TBD : 34980255
0 Days Left
Railway Transport
Maharashtra
Ref. Document
Due on : 19 Aug, 2025
Gem bids for Primary, Primary Suspension Shims, 1Mm, Primary Suspensionshims, 2Mm, Primary Suspension Shims, 3Mm, Secondarysuspension Shims, 3Mm, Secondary Suspension Shims, 5Mm, Secondary Suspension Shims, 13Mm
#TBD : 34987049
0 Days Left
Railway Transport
Maharashtra
Ref. Document
Due on : 07 Aug, 2025
Licensing Of Space For Automated Micro-retail Vending Kiosks At Selected Metro Stations Of Nagpur Metro Rail Project For A Period Of 03 Years
#TBD : 34978906
0 Days Left
Railway Transport
Maharashtra
Ref. Document
Due on : 04 Aug, 2025
P1pd47.2025.Licensing Of Exclusive Train Wrapping Rights On Select Trainsets And External Advertisement On Stations Of Pune Metro Rail Project For A Period Of 07 Years On Package Basis.
#TBD : 34987619
10 Days Left
Railway Transport
Maharashtra
154.30 Crore
Due on : 02 Sep, 2025
Design, Supply, Installation, Testing And Commissioning Of Open Loop Emv Ncmc Card And Qr Code Based Automatic Fare Collection Afc System Along With Camc For Nagpur Metro Rail Project Phase-ii
#TBD : 34975238
0 Days Left
Railway Transport
Maharashtra
Ref. Document
Due on : 11 Aug, 2025
Design, Manufacture, Supply, Testing, Commissioning Of Passenger Rolling Stock 16 Nos Train Sets And Training Of Personnel With Comprehensive Annual Maintainainence Contract 15 Year For Nagpur Metro Rail Project Phase-Ii
#TBD : 35164262
26 Days Left
Railway Transport
Maharashtra
53.45 Lacs
Due on : 18 Sep, 2025
Lighting Work For Parking And Other Area At Ground Level Of Central Park And Pethpada Metro Station Of Navi Mumbai Metro Line-1 On Behalf Of Cidco.
#TBD : 34975170
0 Days Left
Railway Transport
Maharashtra
142.40 Crore
Due on : 18 Aug, 2025
Design And Construction Of Elevated Metro Viaduct Of Length 20.527 Kms Between Ug Ramp And Balkum Naka Including Depot Approach Viaduct And Three Special Spans For Thane Integral Ring Metro Project.