#TBD : 35177466
18 Days Left
Power Plant
Jharkhand
94.23 Crore
Due on : 11 Sep, 2025
Design Engineering Supply Installation Testing And Commissioning Of Grid Substations At Jadugoda And Additional 132 Kv Bays At Dhalbhumgarh Gss Along With Dismantalling Works
#TBD : 35117822
10 Days Left
Power Plant
Jharkhand
61.82 Crore
Due on : 03 Sep, 2025
Design Supply Installation Testing And Commissioning Of 132/33kv Gis Substations At Sundarnagar Leftover Work
#TBD : 35177651
2 Days Left
Power Plant
Jharkhand
Ref. Document
Due on : 26 Aug, 2025
Construction Of Boundary Wall Of Nigam Land Around 33/11 Kv P/s/s Masaliya, Dumka 135/pr/jbvnl/2025-26
#TBD : 35118065
8 Days Left
Power Plant
Jharkhand
1.88 Crore
Due on : 01 Sep, 2025
Selection Of Agency To Provide Non-it Infra Annual Maintenance Contract And Onsite Support For Data Center, Ranchi And Drc
#TBD : 35177921
15 Days Left
Power Plant
Jharkhand
68.44 Lacs
Due on : 08 Sep, 2025
Supply Installation Testing And Commissioning Of Laser-based Projection Engines With Adaptation Kit And Video Wall Controller Both Compatible With Existing Delta Model At Scada Control Center At Ranchi And Dhanbad
#TBD : 35117739
4 Days Left
Power Plant
Jharkhand
21.02 Crore
Due on : 28 Aug, 2025
Design Engineering Supply Of Materials Equipments Erection Testing And Commissioning Of 132 Kv Dc 3ph Muhammadganj Tss - Gss Japla Transmission Line On Turnkey Basis
#TBD : 35117773
4 Days Left
Power Plant
Jharkhand
7.80 Crore
Due on : 28 Aug, 2025
Design Engineering Supply Of Materials Erection Testing And Commissioning Of 02 Nos Additional 132 Kv Line Bay At Gss Bhawanathpur On Turnkey Basis
#TBD : 35118053
4 Days Left
Power Plant
Jharkhand
20.41 Crore
Due on : 28 Aug, 2025
Design Engineering Supply Of Materials Equipments Erection Testing And Commissioning Of 132 Kv Dc 3ph Nagaruntari Tss - Gss Bhawnathpur Nagaruntari Transmission Line On Turnkey Basis
#TBD : 35118088
4 Days Left
Power Plant
Jharkhand
8.75 Crore
Due on : 28 Aug, 2025
Design Engineering Supply Of Materials Erection Testing And Commissioning Of 2 Nos Additional 132 Kv Line Bay At Grid Sub-station Japla Including Construction Of Store Shed Pcc Road Unloading Platform And Metal Fencing Boundary On Turnkey Basis
#TBD : 35177853
8 Days Left
Power Plant
Jharkhand
18.88 Lacs
Due on : 01 Sep, 2025
Deployment Of Surveyor To Carry Out Detailed Survey Of Transmission Line Infringing At Different Locations Of Under Construction Nh 143d From Ch. 59.300 To Ch. 149.500 And Nh 43 In Between Ch. 000 To Ch. 32.370