#TBD : 34950276
0 Days Left
Power
Himachal Pradesh
1.27 Lacs
Due on : 31 Jul, 2025
Tender For Rm Ht Lt Line Dtr Under Esd Paonta Sahib Ii Sh Repair Replacement Of Burnt Damaged 11 Kv Go Switch Parts Isolators Installed At Dtrs And Between Various Feeders At Various Locations In Es I Paonta Sahib And Es Ii Devinagar Paonta Sahi Nit/41/2025-26
#TBD : 34277136
0 Days Left
Power
Himachal Pradesh
Ref. Document
Due on : 02 Apr, 2025
Supply And Installation Of Microsoft Sql Database Server Licenses And Microsoft Windows Server Operating System License For Official Use
#TBD : 34950271
0 Days Left
Power
Gujarat
Ref. Document
Due on : 06 Aug, 2025
Design, Engineering, Manufacturing, Transportation, Supply, Erection, Testing And Commissioning Of Fote Complete In All Respect Including Fodp And Fo Approach Cable From Opgw Terminal Box For Data Transmission, Teleprotection Dharampur
#TBD : 34707368
0 Days Left
Power
Himachal Pradesh
Ref. Document
Due on : 09 Jul, 2025
Fabrication , Supply And Installation Of Log Boom / Debris Barrier Systems Including Siding Arrangements At Power Intake Of Barrage Site In Order To Prevent Trespassing Debris Through The Trash Racks Of Sawra Kuddu Hatkoli , Tehsil Jubbal
#TBD : 34579700
0 Days Left
Power
Himachal Pradesh
Ref. Document
Due on : 12 Jun, 2025
Refurbishing And Renovation Of Existing Portion Of Sub Ldc Building Of Hpsebl Transferred To Hpsldc For Setting Up Of Backup Control Centre At Mattansidh Hamirpur Hp
#TBD : 34521047
0 Days Left
Power
Himachal Pradesh
Ref. Document
Due on : 10 Jun, 2025
Supply Installation Configuration Testing And Commissioning Of Intrusion Prevention System Ips, Web Application Firewall Waf, And Aaa Device To Enhance Cyber Security Of It System Installed At Hpsldc From Various Cyber Threats Through E-Reverse Aucti
#TBD : 34288876
0 Days Left
Power
Himachal Pradesh
Ref. Document
Due on : 10 Apr, 2025
Supply Installation Testing And Commissioning Of Intelligent Fire Alarm System And Fire Extinguishers In The Hpsldc Backup Control Centre Mattansidh
#TBD : 35088266
0 Days Left
Power
Himachal Pradesh
Ref. Document
Due on : 22 Aug, 2025
Construction Of 132 Kv M/c Transmission Line On Monopole For Termination Of Two Circuits Of 132 Kv Jamta-johron D/c Line And One Circuit Of 132 Kv Giri-johron S/c Line At 132/33 Kv Hpsebls Johron Substation In District Sirmaur Of Himachal Pradesh
#TBD : 34287276
0 Days Left
Power
Himachal Pradesh
Ref. Document
Due on : 01 Apr, 2025
Shifting Of Existing 22Kv Ht Line Of M/S. Sai Eternal Foundation Pvt. Ltd. Crossing Over Dam Site Of 450 Mw, Shongtong - Karchham Hep
#TBD : 34589428
0 Days Left
Power
Himachal Pradesh
Ref. Document
Due on : 18 Jun, 2025
Supply, Installation, Testing, Commissioning Of Three No. Of Vsat Along With Integration Of Same With Existing Data Logger Fo Data Transmission And Modification In Exiting Software Of Early Warning System At Shongtong - Karchham