#TBD : 31530469
0 Days Left
Construction
West Bengal
2.47 Lacs
Due on : 26 Mar, 2024
New Water Supply Connection To Patanjali Foods Limited, Bijoyramchak Ward No. 12 P.O And P.S Durgachak Haldia 721602 Dist. Purba Medinipur For Supply Of 300 Kiloliters Water Per Day Under Industrial Category.
#TBD : 31384995
0 Days Left
Construction
West Bengal
3.87 Lacs
Due on : 13 Mar, 2024
Installation Of 1One No. Submersible Pump Near House Of Lakshman Pattanayak Plot No. 44 J.L. 156 Mouza Barghasipur Ward No. 18
#TBD : 31428222
0 Days Left
Construction
West Bengal
2.32 Crore
Due on : 05 Apr, 2024
Construction Of Accommodation Facility Building Civil Work For Registered Construction Workers At Digha Phase I Upto 1St Floor Purba
#TBD : 31436345
0 Days Left
Construction
West Bengal
59.74 Lacs
Due on : 05 Apr, 2024
Construction Of Cement Concrete Road From Dhanda Pucca Bridge To Gurupada Bhunia House At Kakra Gp Under Bhagawanpur I Block.
#TBD : 31437422
0 Days Left
Construction
West Bengal
80.49 Lacs
Due on : 05 Apr, 2024
Construction Of Concrete Road From Saleman Mallik House To Arindum Khatua Via Badal Chandra Ghoria House And Ichapur Icds
#TBD : 31428209
0 Days Left
Construction
West Bengal
5.83 Lacs
Due on : 20 Mar, 2024
Repairing Of Kitchen Along With Dining Hall And Roof Treatment At Haldia Bhawan 38/Hda/Ec Of 2023 2024
#TBD : 31430378
0 Days Left
Construction
West Bengal
51.03 Lacs
Due on : 25 Mar, 2024
Installation Of 112 Kwp Grid Connected Roof Top Solar Photo Voltaic For Power Generation At Different Estates Offices Assets Of Hda.
#TBD : 31522399
0 Days Left
Construction
West Bengal
22.83 Lacs
Due on : 05 Apr, 2024
Supply Installation Testing And Commissioning Of Led Street Lighting System And One Mini Mast With Led Flood Lights From Banamali Jana House To Gharkilla Harasankar Nath Jiu Shiv Mandir And Gharkilla Prathamik Vidyalay Via Soadighi Barnaparichay Club
#TBD : 31395071
0 Days Left
Construction
West Bengal
20.76 Lacs
Due on : 23 Mar, 2024
Restoration Of Led Street Lighting System Including Supply And Laying Of Lt Power Cable Cable Laying Through Micro Tunneling Method Through Hdpe Pipe Etc From Srirampur Bridge To Hoglabari Bdo Office More At Moyna Bazar Area.
#TBD : 31447964
0 Days Left
Construction
West Bengal
84.70 Lacs
Due on : 05 Apr, 2024
Renovation And Up Gradation Of Community Hall At Chandipur Development Block