#TBD : 33547455
0 Days Left
Scientific Research And Instruments
Haryana
1.60 Crore
Due on : 02 Jan, 2025
Supply, Installation, Testing And Commissioning Of Sample Counting Statistics Lab At School Building-Ii
#TBD : 33685886
0 Days Left
Scientific Research And Instruments
Haryana
1.73 Crore
Due on : 21 Jan, 2025
Supply, Installation, Testing And Commissioning Sitc Of Bio-Doismetry Lab At School Building-Ii, Gcnep, Bahadurgarh, Haryana
#TBD : 33685799
0 Days Left
Scientific Research And Instruments
Haryana
21.90 Lacs
Due on : 09 Jan, 2025
Work Contract Related To Face Lifting, Including Replacement Of Sanitary Fittings, Glass Panes, Aluminium Works For Partitioning And Fixing Of Pvc Toilet Doors And Assembly At Gcnep Bahadurgarh, Haryana
#TBD : 33737731
0 Days Left
Scientific Research And Instruments
Haryana
19.25 Lacs
Due on : 16 Jan, 2025
Repair Work And Upkeep Of Testbed Site And Related Infrastructure At Setbf, Gcnep
#TBD : 33685839
0 Days Left
Scientific Research And Instruments
Haryana
21.00 Lacs
Due on : 08 Jan, 2025
Works Including Plastering, Painting, Fixing Of Brick Tiles And Fire Rated Wooden Doors At Gcnep, Bahadurgarh, Haryana As Per Detailed Technical Specifications In Section Ii
#TBD : 33685932
0 Days Left
Scientific Research And Instruments
Haryana
19.00 Lacs
Due on : 09 Jan, 2025
Works Related To Construction Of Fountain At School Building Ii, Ground Levelling, Grass Carpeting And Reflective Signages At Gcnep, Bahadurgarh, Haryana
#TBD : 34249790
0 Days Left
Scientific Research And Instruments
Haryana
42.00 Lacs
Due on : 11 Apr, 2025
Construction, Installation, Testing And Commissioning Of 2 Nos. Of 5000 Lph Reverse Osmosis Plant Including Civil Construction Of Shed, Laying Of Cpvc Pipelines For Potable Water And Installation Of Electric Panel At Gcnep Campus And Township, Bgarh
#TBD : 32480470
0 Days Left
Scientific Research And Instruments
Haryana
1.47 Crore
Due on : 27 Aug, 2024
Construction Of Thermally Insulated Ms Portable Cabins With Base Platform And Electrical Connections, Drying Shed, Laying Of Water Line, Electrical Cable And Optical Fibre
#TBD : 33768948
0 Days Left
Scientific Research And Instruments
Haryana
1.25 Crore
Due on : 06 Feb, 2025
Construction Installation, Testing And Commissioning Of 1 Kld Etp Based On Chemical Treatment Including Construction Of Shed, Concrete Trenches, Laying Of Pvdf Pipelines Inside Concrete Trenches For Effluent Streams And Installation Of Elect. Panel
#TBD : 27863362
0 Days Left
Scientific Research And Instruments
Rajasthan
24.00 Lacs
Due on : 09 May, 2023
Fabrication Of Accessories For 2500 Lph Pilot Scale Dye Effluent Treatment Plant Developed Using
Cellulose Based Arsenic Removal Barc Technology And Deployed