#TBD : 35259692
1 Days Left
Power Plant
Uttar Pradesh
5.00 Lacs
Due on : 02 Sep, 2025
Work Of Replacement Of Jarjar Conductor, Poles And Associated Work On 33 Kv/11 Kv/ Lt Lines Required Due To Storm/daviya Aapda In The Area Of Eudd
#TBD : 35252318
15 Days Left
Power Plant
Uttar Pradesh
1.34 Crore
Due on : 16 Sep, 2025
Construction Of Proposed 2x5 Mva 33/11 Kv Sub Station Nandgaon And Associated 33 Kv And 11 Kv Line
#TBD : 35251226
15 Days Left
Power Plant
Uttar Pradesh
82.78 Lacs
Due on : 16 Sep, 2025
Construction Work 33 Kv Line From 220/132/33 Kv Substation Dakor To 33/11 Kv Substation Under Green Corridor Scheme In Business Plan 2025
#TBD : 35251280
15 Days Left
Power Plant
Uttar Pradesh
35.16 Lacs
Due on : 16 Sep, 2025
Construction Work Of 33 Kv Line From 220/132/33 Kv Substation Virdha To 33/11 Kv Substation Virdha Under Green Corridor Scheme In Business Plan 2025-26
#TBD : 35250225
9 Days Left
Power Plant
Uttar Pradesh
5.00 Lacs
Due on : 10 Sep, 2025
Replacement Of Damaged Underground 300 Meter 11kv Xlpe Cable 3x185 Sq.mm. By Hdd Method Expressway Crossing By New 11kv Xlpe Cable 3x185 Sqmm Along With 04 Nos Cable Box Etc Work
#TBD : 35252315
15 Days Left
Power Plant
Uttar Pradesh
20.22 Lacs
Due on : 16 Sep, 2025
Construction Work 33 Kv Line From 132/33 Kv Substation Kadaura To 33/11 Kv Substation Chandarsi Under Green Corridor Scheme In Business Plan 2025-26
#TBD : 35251363
15 Days Left
Power Plant
Uttar Pradesh
Ref. Document
Due on : 16 Sep, 2025
The Work Of Fabrication Of 11 Kv New Line Under The Jurisdiction Of Electricity Urban Distribution Division-chandra Nagar
#TBD : 35249086
15 Days Left
Power Plant
Uttar Pradesh
9.25 Lacs
Due on : 16 Sep, 2025
Business Plan Year 2025-26 Semi Turnkey Basis Work Under Edd Mauranipur
#TBD : 35259653
1 Days Left
Power Plant
Uttar Pradesh
5.00 Lacs
Due on : 02 Sep, 2025
Work Of Replacement Of Jarjar Conductor, Poles And Associated Work On 33 Kv/11 Kv/ Lt Lines Required Due To Storm/daviya Aapda In The Area Of Edd-pilua
#TBD : 35251654
14 Days Left
Power Plant
Uttar Pradesh
5.38 Lacs
Due on : 15 Sep, 2025
Carrying Out Various Electric Works On Semi Turn Key Basis For Increasing Capacity Of 33 Kv Substation And Augmentation, Strengthening Of 33 Kv Lines In Bp 2025 26