#TBD : 34986309
12 Days Left
Civil Work
Bihar
12.30 Crore
Due on : 13 Aug, 2025
Construction Of High Level Rcc Bridge 5X21.00 Of Jamalpur G.N. Bund To Jhowabahiyar-Harinmar-Athrahiya-Gogri Bund Road Chainage : 3100- 3300
#TBD : 34409352
0 Days Left
Civil Work
Bihar
60.90 Crore
Due on : 28 May, 2025
Construction Of Rob & Its Approaches In Between Saharsa & Panchgachiya Railway Station In L.c No-31 Spl Class In Bangali Bazar To Purab Bazar Road In The District Of Saharsa On Engineering, Procurement & Construction (epc) Mode
#TBD : 34986284
12 Days Left
Civil Work
Bihar
57.17 Crore
Due on : 13 Aug, 2025
Construction Of Rob In Lieu Of Lc No- 61Spl At Km- 177/17-19 Between Baraunibegusarai Stations At Road Km0.200 Of Mrd Between Bju To Zero Mile
#TBD : 34986196
5 Days Left
Civil Work
Bihar
32.11 Crore
Due on : 06 Aug, 2025
Construction & Re-Setting/Rearrainging Of New Pontoon Bridge & Resetting Of 65 Pontoon Sets, Jetty, Approach Road And Maintenance For The 5 Financial Year I.E F.Y 2026-27 To 2030- 31 Of Pontoon Bridge From The Alignment And Storing The Pontoon Set At Safe Place On T He Side Of Ganga River Embankment Between Pattharghat And Hardashpur Village In Sa Mastipur District During Rainy Season And Watching The Pontoon Sets Safety Anchored Alo Ng The River Embankment During Rainy Season For Six Month As Well As Rearranging The Pontoon Sets When Ever Required Due To Increasing And Decreasing Of Water Level.
#TBD : 34972683
12 Days Left
Civil Work
Bihar
53.03 Crore
Due on : 13 Aug, 2025
Construction Of H.L. R.C.C. Bridge 12X24.00M At Ibrahimpur Ghat Under Mehasi Blo Ck
#TBD : 34972751
12 Days Left
Civil Work
Bihar
49.87 Crore
Due on : 13 Aug, 2025
Construction Of H.L.R.C.C. Bridge Over Lalbakeya River Near Balua Guabari Under Dha Ka Block
#TBD : 34417001
0 Days Left
Civil Work
Bihar
7.56 Crore
Due on : 13 May, 2025
Construction Of High Level Rcc Bridge-cum-approach Road In 4th Km Of Medical College-mathurapur Road (sh-101) Under Total Length Of Bridge 58.40 M Length Of Approach Road- 300 M Type Of Foundation- Pile Foundation
#TBD : 34447487
0 Days Left
Civil Work
Bihar
696.52 Crore
Due on : 21 May, 2025
Construction Of Green Field 4-lane Highway (tourist Way Of Rajgir Connecting Buddhist Circuit) From Salepur To Rajgir At Nh 82 Via Noorsarai-ahiyapur Nalanda (biharsharif) Silao Of Total Length 27.180 Km
#TBD : 34986251
12 Days Left
Civil Work
Bihar
126.50 Crore
Due on : 13 Aug, 2025
Construction Of Rob In Between Railway Station Baruniteghra L.C. No. 7B
#TBD : 34385667
0 Days Left
Civil Work
Bihar
37.00 Crore
Due on : 10 May, 2025
Construction Work Of Road From Sipahapur To Chakmohabbat (panwara Bridge Access) And Jail Bock Muzaffarpur Saha Rok To Chadhwara Bridge Access Road