#TBD : 34894290
0 Days Left
Construction
West Bengal
15.95 Lacs
Due on : 12 Aug, 2025
Renovation Of Chambers At First Floor Of Paribahan Bhaban-i, 12, R.n. Mukherjee Road, Kolkata-70000. 11/wbtidc/ce/2025-26
#TBD : 34505064
0 Days Left
Construction
West Bengal
2.14 Crore
Due on : 05 Jun, 2025
Construction Renovation Of Gangway Cum Pontoon Jetty At Dayapur Ferry Ghat In The Dist South 24 Parganas 04/wbtidc/2025-26
#TBD : 34671339
0 Days Left
Construction
West Bengal
14.15 Crore
Due on : 11 Jul, 2025
Design Structural Vetting And Construction Of Search And Rescue Centres
#TBD : 34578299
0 Days Left
Construction
West Bengal
26.11 Lacs
Due on : 25 Jun, 2025
Soil Investigation Report For Proposed Automated Testing Station Ats At Different Location In 12 Twelve
#TBD : 34519562
0 Days Left
Construction
West Bengal
1.00 Crore
Due on : 19 Jun, 2025
Construction Of Pre Cast Rcc Jetty On The River Bank Including Bank Protection Work At Sambhunagar Dugdugi Ghat Under Gosaba Block Dist South 24 Parganas 07/wbtidc/ce/2025-26 Sl 2
#TBD : 34515271
0 Days Left
Construction
West Bengal
93.91 Lacs
Due on : 19 Jun, 2025
Construction Of Pre Cast Rcc Jetty On The River Bank Including Bank Protection Work At Taltala Ferry Ghat Under Patharpratima Block Dist South 24 Parganas 07/Wbtidc/Ce/2025-26 Sl 1
#TBD : 34617283
0 Days Left
Construction
West Bengal
39.75 Lacs
Due on : 25 Jun, 2025
Refurbishment Of Existing Toilet Block With Electrical Work And Hanging Wall Cabinet At 1st Floor Of Paribahan Bhaban I 12 R N Mukherjee Road Kolkata 700001 09/wbtidc/ce/2025-26
#TBD : 34510754
0 Days Left
Construction
West Bengal
1.24 Crore
Due on : 19 Jun, 2025
Construction Of Pre Cast Rcc Jetty On The River Bank Including Bank Protection Work At Sitarampur Ferry Ghat Under Patharpratima Block
#TBD : 35152577
14 Days Left
Construction
West Bengal
14.15 Crore
Due on : 08 Sep, 2025
Construction Of Src And Iccc Building At Konnagar, Bauria, Authpur And Falta Locations And Command And Control Centre At Botanical Garden. 2nd Call In-wbtidcl-475191-cw-rfb 2nd Call
#TBD : 34513130
0 Days Left
Construction
West Bengal
4.56 Lacs
Due on : 02 Jun, 2025
Civil Interior Exterior Works And Electrical Works For Setting Up Canteen Facility Within The Scrapped Bus At Paribahan Bhaban Ii Kasba Depot Compound Kolkata 700 107 12 R N Mukherjee Road Kolkata 700 001 06/wbtidc/ce/2025 - 26