#TBD : 34018397
0 Days Left
Power Plant
West Bengal
1.87 Crore
Due on : 25 Feb, 2025
Design, Engineering, Manufacturing/ Procurement, Testing, Supply, Installations, And Commissioning Of 07Nos Rooftop Grid Connected Solar Pv Power Plant With Cumulative Capacity
#TBD : 34230647
0 Days Left
Power Plant
West Bengal
3.14 Crore
Due on : 28 Mar, 2025
Manufacturing, Supply, Installation And Five Years Comprehensive Maintenance Of Total 40 Nos Solar Powered Drinking Water System
#TBD : 34185627
0 Days Left
Power Plant
West Bengal
7.08 Crore
Due on : 05 Apr, 2025
Site Survey, Design, Engineering, Manufacturing/ Procurement, Testing, Supply, Installations And Commissioning, 05 Years Comprehensive Maintenance For 100 Nos Of Solar Powered Irrigation Pumps
#TBD : 34337830
0 Days Left
Power Plant
West Bengal
3.25 Crore
Due on : 28 Apr, 2025
Site Survey, Design, Engineering, Manufacturing, Procurement, Testing, Supply, Installations And Commissioning, 05 Years Comprehensive Maintenance
#TBD : 33947257
0 Days Left
Power Plant
West Bengal
1.87 Crore
Due on : 23 Feb, 2025
Design, Engineering, Manufacturing/ Procurement, Testing, Supply, Installations, And Commissioning Of 07Nos Rooftop Grid Connected Solar Pv Power Plant With Cumulative Capacity
#TBD : 34166639
0 Days Left
Power Plant
West Bengal
3.14 Crore
Due on : 28 Mar, 2025
Manufacturing, Supply, Installation And Five Years Comprehensive Maintenance Of Total 40 Nos Solar Powered Drinking Water System
#TBD : 34338980
0 Days Left
Power Plant
West Bengal
22.62 Lacs
Due on : 25 Apr, 2025
Site Survey, Capacity Fixation, Design, Engineering, Manufacturing/ Procurement, Testing, Supply, Installations Commissioning, 05 Years Comprehensive Maintenance
#TBD : 33786841
0 Days Left
Power Plant
Tamil Nadu
19.79 Lacs
Due on : 25 Jan, 2025
Supply, Installations, Fitting And Fixing And Commissioning, Five 5 Years Comprehensive Maintenance Of Total 70 Nos Of Solar Pv Street Lighting Systems At Ekalavya Model Residential School And Hostel Premises In Bankura, Birbhum, Dakshin Dinajpur,
#TBD : 34404301
0 Days Left
Power Plant
West Bengal
2.27 Lacs
Due on : 25 Apr, 2025
Design, Supply And Installations Of Furniture For Work Station At The Ground Floor Of Bikalpa Shakti Bhawan.
#TBD : 33930807
0 Days Left
Power Plant
West Bengal
Ref. Document
Due on : 25 Feb, 2025
Design, Engineering, Manufacturing/Procurement, Testing, Supply, Installation And Commissioning Of 07 Nos. Rooftop Grid Connected Solar Pv Power Plant With Cumulative Capacity 300 Kwp With 5 Years Comprehensive Maintenance On Turnkey Basis