#TBD : 34323208
0 Days Left
Canal/irrigation/dam Work
Maharashtra
1.25 Crore
Due on : 11 Apr, 2025
Emergency Work Of Removing Floating Dabris Accumulated On Upstream Side Of Redial Gates Of Lower Pus Medium Project
#TBD : 34324750
0 Days Left
Canal/irrigation/dam Work
Maharashtra
12.78 Crore
Due on : 16 Apr, 2025
Dewatering & Necessary Repairing Using Mortar To 1st And 2nd Bay Of Eda Ol Gosikhurd Project, Ta. Pauni, Dist. Lakhs Bhandora
#TBD : 34324706
0 Days Left
Canal/irrigation/dam Work
Maharashtra
Ref. Document
Due on : 11 Apr, 2025
Design And Construction Of Rcc Lord Shiva Statue 108 Feet High (measured From The Foot To The Crown) At Ambhora, Dist-nagpur Including The Required Basic Infrastructure Of Rcc Statue. Design And Construct Es Per 3d Model, Including Skin Concrete (self Com 1 Pacting Concrete), Rcc Work In M40 Grade, Cuter And Internal Shuttering, Shuttering For Skin And Rcc Work, Scaffolding Transport From Workshop, Loading And Unloading, Including All Lead & Lift, Preparation Of Frp Molds, Reinforcement Work With Fe500 Grade For Rcc Work, Metal Coating Of Zinc Work On Skin After Mild Sand-blasting Of Rcc Surface, Final Metal Coating Of Zinc And Painting On Skin Desired Colour, Lighting Arrester, Provision Of Necessary Electrical Conduit Etc Complete.
#TBD : 34323190
0 Days Left
Canal/irrigation/dam Work
Maharashtra
1.35 Crore
Due on : 11 Apr, 2025
Construction Of Land Development (part Works Of Field Channel) On Moharana Minor No 1,2 And 3 Of Gavarala Distributary And Direct Outlet Omaking From Tail Distributary Of Branch-3 In Command Area Of Glbc 425 Ha (cca)
#TBD : 34383381
0 Days Left
Canal/irrigation/dam Work
Maharashtra
9.90 Crore
Due on : 28 Apr, 2025
Construction Of Protection Wall And Protective Mesh For Tunnel Shaft, Resectioning Of Canal From 0 To 26 Kin, Protection Wall/bund
#TBD : 34252584
0 Days Left
Canal/irrigation/dam Work
Maharashtra
8.22 Crore
Due on : 03 Apr, 2025
Construction Of Balance C.c.lining Km. 15 To Km.37.3 Of Deoli Branch Canal Offtaking On Main Canal Of Lower Wardha Project
#TBD : 34364719
0 Days Left
Canal/irrigation/dam Work
Maharashtra
67.64 Lacs
Due on : 22 Apr, 2025
Desilting Of Drains, Barbed Wire Rs. Fencing To Open Space For Graveyard, Repairs To Samaj Mandir, Houd, Bazaar Otte & E.s.r At New Rehabilitated Goothan Dharwada-dharwada Tah. Tiwasa
#TBD : 34428358
1 Days Left
Canal/irrigation/dam Work
Maharashtra
34.46 Lacs
Due on : 02 May, 2025
Construction Of 5 Wua Buildings For Jagnade Wua (mauza-bhagadi), Gadage Maharaj Wua (mauza-mandhal), Rashtrasant Wua (mauza-mandhal), Haritkranti Wua (mauza-sarandi Bk.) And Annapurna Wua (mauza-asgav) Under Gosikhurd Left Bank Canal
#TBD : 34323182
0 Days Left
Canal/irrigation/dam Work
Maharashtra
3.06 Crore
Due on : 11 Apr, 2025
Construction Of Land Development Part-1 Works Of Field Channel] Undar Water User Association Of Jelvubial Defnam-karandala) Dnyaneshhwari (mauza Karandala) Djni Jawan Lai Kisan (mam Kiranti) In Command Ares Of 01,
#TBD : 34376374
0 Days Left
Canal/irrigation/dam Work
Maharashtra
1.12 Crore
Due on : 23 Apr, 2025
Construction Of Tailing On Sawargaon Minor Offtaking From Tail Distributary Of Branch 3 On Glbc