#TBD : 31309091
0 Days Left
Construction
Uttaranchal
Ref. Document
Due on : 11 Mar, 2024
New Construction Of Jamrani Colony Buildings Construction Of Type Iii 24 Junits And Type V 2 Units
#TBD : 31409619
0 Days Left
Construction
Uttaranchal
Ref. Document
Due on : 15 Mar, 2024
Construction Of Two Lane Road From Dwar Bridge Maldevta To Song Dam Site Reach 0.00 To 10.30 Km In Raipur Development Block And Two Lane Bridge Of 60 Meter Span On Song River In Maldevta
#TBD : 31418286
0 Days Left
Construction
Uttaranchal
130.64 Crore
Due on : 16 Apr, 2024
Civil And Hm Works Of Song Dam Including Appurtenant Works And Water Conductor System From Song Dam To Water Treatment Plant Near Khalanga War Memorial. Civil Works Including Hm Works For Construction Of 130.6 M High Concrete Gravity Dam And Appurtenant Works Across River Song Of Song Dam Drinking Water Project
#TBD : 31406932
0 Days Left
Construction
Uttaranchal
Ref. Document
Due on : 22 Mar, 2024
Town Planning Consultant Planning Consultant For Formulation Of Rehabilitation And Resettlement Master Plan At Proposed Site Situated At Prag Farm Dist Udham Singh Nagar For Project Affected Families Of Jamrani Drinking Water Multipurpose Project
#TBD : 31237038
0 Days Left
Construction
Uttaranchal
202.45 Crore
Due on : 30 Mar, 2024
Civil And Hydromechanical Works Of Dam And Appurtenant Works Civil Works Including Hm Works For Construction Of 150.6 M High Concrete Gravity Dam And Appurtenant Works Across River Gola Of Jamrani Dam Project
#TBD : 31321581
0 Days Left
Construction
Uttaranchal
Ref. Document
Due on : 31 Mar, 2024
Construction Work Of Residential Buildings Type – Iii And Type – V
#TBD : 31501854
0 Days Left
Construction
Uttaranchal
Ref. Document
Due on : 30 Mar, 2024
Work Of Planning Consultant For Formulation Of Rehabilitation And Resettlement Master Plan At Proposed Site Situated At Prag Farm Dist Udham Singh Nagar For Project Affected Families Of Jamrani Drinking Water Multipurpose Project
#TBD : 31154632
0 Days Left
Construction
Uttaranchal
Ref. Document
Due on : 01 Mar, 2024
New Construction Of Above Buildings Construction Of Type Iii 24Units And Type V 2 Units
#TBD : 31508978
0 Days Left
Construction
Uttaranchal
12.45 Crore
Due on : 15 Apr, 2024
Strengthening Of C.H.C. Raipur From 10 Beds To 30 Beds Hospital
#TBD : 31187873
0 Days Left
Construction
Uttaranchal
Ref. Document
Due on : 15 Mar, 2024
Upgradation Of Amritpur Jamrani Motor Road Km 0.00 To 8.600