#TBD : 34420452
0 Days Left
Power
Uttar Pradesh
8.71 Crore
Due on : 29 Apr, 2025
Construction Work Of 02 Nos. 220kv Outdoor Gis Feeder Bay And 01 No. 220kv Ais Bus Coupler Feeder Bay At Existing 220kv Substation Modipuram, On Turnkey Basis
#TBD : 34396361
0 Days Left
Power
Uttar Pradesh
1.62 Lacs
Due on : 25 Apr, 2025
Work Of Attending Of Oil Leakage Through Cold Welding Hypoxy Compound Of 160 Mva T/f-ii At 220 Kv S/s Chhata
#TBD : 34413041
2 Days Left
Power
Uttar Pradesh
Ref. Document
Due on : 03 May, 2025
Increasing Capacity 3x200 Mva To 3x200 Mva And 160 Mva At 220 Kv Sub Station Sarojini Nagar
#TBD : 34394718
0 Days Left
Power
Uttar Pradesh
13.88 Lacs
Due on : 01 May, 2025
Replacement Of Transformer Differential Relay And Overcurrent Earth Fault Relay At Different Sub Station
#TBD : 34394870
0 Days Left
Power
Uttar Pradesh
1.65 Lacs
Due on : 25 Apr, 2025
Supply Of Copper Bond And Sand Bucket At Various Substation
#TBD : 34390929
0 Days Left
Power
Uttar Pradesh
2.39 Lacs
Due on : 22 Apr, 2025
Overhauling Of Transformer Cooling Fan, Supply And Fixing Of Fan Contactor, Overload Relay, Mcb At 132 Kv S/s Handia, Saidabad And Gyanpur Pump Cannal And Overhauling Of 63 Mva Dg Set At 132 Kv S/s Saidabad, Under Electy. Trans. Division-i
#TBD : 34395217
0 Days Left
Power
Uttar Pradesh
3.37 Lacs
Due on : 22 Apr, 2025
Carriage, Installation And Replacement Of Ct/pt Of Various Voltage Level At Various Sub-stations Under Electy. Trans.
#TBD : 34393246
13 Days Left
Power
Uttar Pradesh
40.29 Lacs
Due on : 14 May, 2025
Maintenance Works And Deployment Of Man Power For O And M Of 220 Kv S/s Jewar Under Etc
#TBD : 34405901
18 Days Left
Power
Uttar Pradesh
Ref. Document
Due on : 19 May, 2025
Painting Of Equipment & Structures Installed At 132 Kv Power Substation Mehdawal Under Executive Engineer, Electricity Dispatch Section-i