#TBD : 34597974
0 Days Left
Water Supply And Drainage
Maharashtra
52.44 Lacs
Due on : 19 Jun, 2025
Psi New 200 Hp Pump At Patlipada Pump House Including All Necessary Arrangements And Providing And Fixing Solar Light At Anjur Bridge Including All Necessary Arrangement And Electrical Insulation Coating On Transformer Floor At Patlipada Pumping Stat
#TBD : 34832627
0 Days Left
Water Supply And Drainage
Maharashtra
1.84 Crore
Due on : 28 Jul, 2025
Scraping And Painting To Bridge And Internal Coating To Clf No 2 And 4 At Wtp Temghar
#TBD : 34618411
0 Days Left
Water Supply And Drainage
Maharashtra
1.39 Crore
Due on : 19 Jun, 2025
Construction Of Rcc Compound Wall For Anjur Land And Construction Of Concrete Road At Mankoli Mbr Entrance Road And Anjur Pipeline Steel Bridge And Furniture And Other Works At New Patlipada Unit Ii Office.
#TBD : 34982759
0 Days Left
Water Supply And Drainage
Maharashtra
42.09 Lacs
Due on : 01 Aug, 2025
Repairs To Existing Rcc Structure I.E. Settled Water Channel Etc. At Wtp Temghar
#TBD : 34598965
0 Days Left
Water Supply And Drainage
Maharashtra
73.98 Lacs
Due on : 19 Jun, 2025
Providing, Lowering, Laying Pipeline For New Kone Feeder Main From Om Petrol Pump To Gove Esr.
#TBD : 34834705
0 Days Left
Water Supply And Drainage
Maharashtra
42.09 Lacs
Due on : 28 Jul, 2025
Repairs To Existing Rcc Structure I.e. Settled Water Channel Etc. At Wtp Temghar
#TBD : 35034989
0 Days Left
Water Supply And Drainage
Maharashtra
19.81 Lacs
Due on : 19 Aug, 2025
Construction Of Toilet For Ladies At Shahad And Wtp Temghar
#TBD : 34597578
0 Days Left
Water Supply And Drainage
Maharashtra
2.60 Crore
Due on : 19 Jun, 2025
Enhancement Of Water Quality Using Alagae Side Chemical Reagent For Sand Cleaning Topping Of Godra River Filter Sand For Filter Beds And Designing Of V Wire At Wtp Temghar.
#TBD : 35034638
0 Days Left
Water Supply And Drainage
Maharashtra
1.69 Crore
Due on : 19 Aug, 2025
Construction Of Rcc Compound Wall From Shahad To Temghar.
#TBD : 34554497
0 Days Left
Water Supply And Drainage
Maharashtra
Ref. Document
Due on : 05 Jun, 2025
Expression Of Interest For Group Mediclaim Insurance Policy Of Stem Employees And Their Family Members