#TBD : 34597974
3 Days Left
Water Supply And Drainage
Maharashtra
52.44 Lacs
Due on : 19 Jun, 2025
Psi New 200 Hp Pump At Patlipada Pump House Including All Necessary Arrangements And Providing And Fixing Solar Light At Anjur Bridge Including All Necessary Arrangement And Electrical Insulation Coating On Transformer Floor At Patlipada Pumping Stat
#TBD : 34597578
3 Days Left
Water Supply And Drainage
Maharashtra
2.60 Crore
Due on : 19 Jun, 2025
Enhancement Of Water Quality Using Alagae Side Chemical Reagent For Sand Cleaning Topping Of Godra River Filter Sand For Filter Beds And Designing Of V Wire At Wtp Temghar.
#TBD : 34554497
0 Days Left
Water Supply And Drainage
Maharashtra
Ref. Document
Due on : 05 Jun, 2025
Expression Of Interest For Group Mediclaim Insurance Policy Of Stem Employees And Their Family Members
#TBD : 34508517
0 Days Left
Water Supply And Drainage
Maharashtra
7.55 Crore
Due on : 16 Jun, 2025
Providing And Erecting Multifunctional Valve On New Rwrm And Pwrm Pipeline
#TBD : 34507475
0 Days Left
Water Supply And Drainage
Maharashtra
Ref. Document
Due on : 03 Jun, 2025
Expression Of Interest For Group Mediclaim Insurance Policy Of Stem Employees And Their Family Members
#TBD : 34618411
3 Days Left
Water Supply And Drainage
Maharashtra
1.39 Crore
Due on : 19 Jun, 2025
Construction Of Rcc Compound Wall For Anjur Land And Construction Of Concrete Road At Mankoli Mbr Entrance Road And Anjur Pipeline Steel Bridge And Furniture And Other Works At New Patlipada Unit Ii Office.
#TBD : 34491574
0 Days Left
Water Supply And Drainage
Maharashtra
39.32 Lacs
Due on : 29 May, 2025
Providing Lowering Laying New Varhala Feeder From Tapping Point To Power House Along Kalyan Bhiwandi Road
#TBD : 34598965
3 Days Left
Water Supply And Drainage
Maharashtra
73.98 Lacs
Due on : 19 Jun, 2025
Providing, Lowering, Laying Pipeline For New Kone Feeder Main From Om Petrol Pump To Gove Esr.
#TBD : 34374337
0 Days Left
Water Supply And Drainage
Maharashtra
4.73 Crore
Due on : 05 May, 2025
Supply, Installation, Testing, Commissioning Actuators And Ahms With Overhauling Existing Actuator At Wtp Temghar And Sitc Of Rmu, Metering Cubical And Overhauling Of 400 And 500 Hp Vt Pump Set With Energy Efficient Coating At Shahad Head Works And Wtp Temghar.
#TBD : 34508111
0 Days Left
Water Supply And Drainage
Maharashtra
2.96 Crore
Due on : 16 Jun, 2025
Providing And Supplying Water Shaft Arrangement To Various Villages To Improve Supply Network