#TBD : 34420551
8 Days Left
Canal And Irrigation And Dam Work
Kerala
12.58 Lacs
Due on : 09 May, 2025
Retaining Wall - 1.5m Ht, 155 Rm Soil And Water Conservation Works At Mattappattu Muppirithode Protection Project No 1006/25 Of Panchayat In Kanjikkuzhi Grama Panchayat Kanjikkuzhi Division
#TBD : 34379181
0 Days Left
Canal And Irrigation And Dam Work
Maharashtra
4.77 Crore
Due on : 22 Apr, 2025
Construction Somthana K.t.weir No.01, Sarangpur K.t.weir No.01, Itali K.t.weir No.03 Tq
#TBD : 34417625
0 Days Left
Canal And Irrigation And Dam Work
Rajasthan
49.24 Lacs
Due on : 28 Apr, 2025
Pasture Development In Pmksy - 2.0 Ramgarh Package No. 02 Near Gaushala
#TBD : 34417239
0 Days Left
Canal And Irrigation And Dam Work
Rajasthan
41.26 Lacs
Due on : 28 Apr, 2025
Plantation Of Panksya In Pasture Land- 2.0 Block Ramgarh
#TBD : 34393111
0 Days Left
Canal And Irrigation And Dam Work
Kerala
12.14 Lacs
Due on : 26 Apr, 2025
Renovation Of Pond Jilla Panchayath , Renovation Of Valiyakulam Arookkutty Grama Panchayath Ward 11 Poochakkal Division General Civil Work
#TBD : 34392978
0 Days Left
Canal And Irrigation And Dam Work
Kerala
12.48 Lacs
Due on : 26 Apr, 2025
Protection Work Of Malayan Canal Idayodikkavu Bridge To Cheravally Bridge At Krishnapuram Grama Panchayat Ward 1 In Krishnapuram Division , Retaining Wall 2.00 M Ht Side
#TBD : 34396805
0 Days Left
Canal And Irrigation And Dam Work
Rajasthan
Ref. Document
Due on : 26 Apr, 2025
Construction Of Farm Pond With Hdpe Plastic Film Geo Membran For Farmpond Lining 500 Micron Sheet, Recharge Shaft For Aquifers And Roof Top Harvesting Structure Work Ps Bayana
#TBD : 34380333
0 Days Left
Canal And Irrigation And Dam Work
Rajasthan
61.10 Lacs
Due on : 20 Apr, 2025
Construction Of Farm Pond Works In Pmksy 2.0 Project Area In Panchayat Samiti Baswa District Dausa
#TBD : 34432153
0 Days Left
Canal And Irrigation And Dam Work
Maharashtra
28.75 Lacs
Due on : 30 Apr, 2025
Construction Of Jodwadi Cnb 01
#TBD : 34379031
0 Days Left
Canal And Irrigation And Dam Work
Maharashtra
4.18 Crore
Due on : 22 Apr, 2025
Construction Pohandul Gated C.n.b No.01, 02, Kharba Gated C.n.b No.01, Kinhola Bu Gated C.n.b