#TBD : 33508689
0 Days Left
Power Plant
Madhya Pradesh
Ref. Document
Due on : 07 Jan, 2025
Invite Proposals For Consultancy Service For Environmental And Social Impact Assessment For Morena Solar Park I Of 600 Mw With Battery Based Energy Storage Solution Including Evacuation Infrastructure And Associated Transmission Lines And Empanelment Of Technically Qualified Bidders For Future Works
#TBD : 33508374
0 Days Left
Power Plant
Madhya Pradesh
Ref. Document
Due on : 06 Jan, 2025
Empanelment Of Agencies To Prepare Detail Project Report For Various Solar Parks With Cumulative Capacity Of Approx. 8000 Mw
#TBD : 33221095
0 Days Left
Power Plant
Madhya Pradesh
Ref. Document
Due on : 15 Nov, 2024
Contract Basis For Survey/Allotment Of Revenue Land For Solar Parks
#TBD : 33001915
0 Days Left
Power Plant
Madhya Pradesh
Ref. Document
Due on : 15 Oct, 2024
Selecting The Re Power Developers For Supply Of Up To 440 Mw Of Assured Peak Power From 600 Mwac Grid Connected Ground Mounted Solar Photo Voltaic Project With Battery Energy Storage Systems
#TBD : 33614884
0 Days Left
Power Plant
Madhya Pradesh
Ref. Document
Due on : 15 Jan, 2025
Auction For Selecting The Solar Power Developers For Supply Of Up To 800 Mw Of Solar Power From Grid Connected Ground Mounted Solar Park Under Tariff Based Competitive Bidding Guidelines
#TBD : 29712760
0 Days Left
Power Plant
Madhya Pradesh
Ref. Document
Due on : 23 Oct, 2023
Selection Of Consulting Services For Development Of Environment, Social And Governance Strategy For Rumsl
#TBD : 31522656
0 Days Left
Power Plant
Madhya Pradesh
Ref. Document
Due on : 30 Mar, 2024
Request For Proposal For Selecting Wind Power Developer For The Development Of A 60Mw Ground Mw Wind Power Project Under Competitive Biding, To Be Connected At Mpptcl Substation For Captive Utilization Of Power By Mpjn At Different Locations
#TBD : 33615705
0 Days Left
Power Plant
Madhya Pradesh
Ref. Document
Due on : 15 Jan, 2025
Auction For Selecting The Solar Power Developers For Supply Of Up To 800 Mw Of Solar Power From Grid Connected Ground Mounted Solar Photo Voltaic Projects To Be Developed At Morena Solar Park
#TBD : 30404531
0 Days Left
Power Plant
Madhya Pradesh
Ref. Document
Due on : 22 Jan, 2024
Selection Of Consultant For Endterm Evaluation Of Environmental Management And R And R Components Of The 750 Mw Solar Power Project Rewa District Madhya Pradesh Selection Of Consultant For Endterm Evaluation Of Environmental Management And R And R Components Of The 750 Mw Solar Power Project
#TBD : 31522567
0 Days Left
Power Plant
Madhya Pradesh
Ref. Document
Due on : 30 Mar, 2024
Request For Proposal For Selecting Solar Power Developer For The Development Of A 100Mw Ground Mounted Solar Pv Project Under Competitive Biding, To Be Connected At Mpptcl Substation For Captive Utilization Of Power By Mpjn At Different Locations