Sales contact :  +91 83205 65287

Sales email :  [email protected]

Rail Coach Factory Tenders | Latest Tenders of Rail Coach Factory

Total 7815 tenders found

Tender Bidding Website covers all Tenders of Rail Coach Factory – Including Rail Coach Factory Government Tenders, e Tender Rail Coach Factory, Rail Coach Factory Tenders and Private Tenders. There is no shortage of business opportunities from the largest Rail Coach Factory Tender Database.

Our website allows you to find Rail Coach Factory tenders online quickly and easily. Subscribers can also opt to receive daily tender alerts through email from TenderBidding.com to guarantee they don't miss out on any opportunities.


#TBD : 31637911
23 Days Left
Railway Transport
Punjab
7.13 Lacs
Due on : 13 May, 2024

Supply of Split Air Conditioner Including Green Ac Wall Mount Type Q2

View

Bidding

Gem Registration

Download

#TBD : 31638920
11 Days Left
Railway Transport
Punjab
Ref. Document
Due on : 01 May, 2024

Supply of Terbinafine Hcl 1% Cream In 10Gm Tube

View

Bidding

Gem Registration

Download

#TBD : 31637476
34 Days Left
Railway Transport
Punjab
Ref. Document
Due on : 24 May, 2024

Supply of Absorption Strip For Flooring, L 2000Mm, As Per Drawing: Lw41101 Alt D, Packing I Nstruction: Brown Papper Wrapping For Individual Item Collectively Packed In Jute Bags Warranty Period: 30 Months After The Date Of Delivery

View

Bidding

Gem Registration

Download

#TBD : 31638391
18 Days Left
Railway Transport
Punjab
Ref. Document
Due on : 08 May, 2024

Supply of Floor End Profile For Lhb Coaches, L 2M., As Per Drawing: Ls41128, Packing Instruct Ion: As Per Standard Packing. It Should Be Ensured That Item Should Not Rub During T Ransportation. The Item Should Be Packed With Adequate Strength. Transit Damage, If Any, Shall Be At The Cost Of Supplier. Warranty Period: 30 Months After The Date Of Delivery

View

Bidding

Gem Registration

Download

#TBD : 31638723
26 Days Left
Railway Transport
Punjab
Ref. Document
Due on : 16 May, 2024

Supply of Set Of Luggage Rack Modules For Lhb Non Ac Chair Car Coaches, As Per Dra Wing: Mpllrmlwscz Version 2, Packing Instruction: 1. Top Fixing Profile:- Item Should Be Wra Pped In Brown Paper Individually And Packed In Wooden Box. 2. Luggage Rack Assy.:- It Em Should Be Wrapped In Brown Paper Individually And Packed In Wooden Box. 3. Read Ing Lamp: - Each Fitting Is Be Wrapped With Biodegradable Bubble Sheet And Packed In Card Board Boxessingle Ply Corrugated. Finally Up To 24 Lights To Be Packed In Car D Board Box Double Ply Corrugated And Tied With 3 Packing Strip Horizontally And 3 Vertically. Note: I Item No. 1, 2 & 3 Should Be Packed In Separate Boxes. Ii A List Sho Uld Be Pasted On Each Box Showing Order No., Pl No., Description Of Item Drg. No./Sp Ec. No., Qty., Firms Name, Address & Date Of Despatch Etc. Warranty Period: 30 Months After The Date Of Delivery Luggage Rack Modules Without Lights For Lhb 2Nd Ac Chair Car Coaches., As Per Drawing: Lz62100 Item 1 To 6 & 27, Packing Instruction: 1. Top Fixing Profile:- Item Should Be Wrapped In Brown Paper Individually And Packed In Wooden Box. 2. Luggage Rack A Ssy.:- Item Should Be Wrapped In Brown Paper Individually And Packed In Wooden Box. 3. Reading Lamp: - Each Fitting Is Be Wrapped With Biodegradable Bubble Sheet And Pa Cked In Card Board Boxessingle Ply Corrugated. Finally Up To 24 Lights To Be Packe D In Card Board Box Double Ply Corrugated And Tied With 3 Packing Strip Horizonta Lly And 3 Vertically. Note: I Item No. 1, 2 & 3 Should Be Packed In Separate Boxes. Ii A L Ist Should Be Pasted On Each Box Showing Order No., Pl No., Description Of Item Drg . No./Spec. No., Qty., Firms Name, Address & Date Of Despatch Etc. Warranty Period: 30 Mo Nths After The Date Of Delivery

View

Bidding

Gem Registration

Download

#TBD : 31638886
4 Days Left
Railway Transport
Punjab
Ref. Document
Due on : 24 Apr, 2024

Supply of Honeycomb Partition Frame For Ac 3 Tier Usbrl Coach As Per Le10297 Alt A Warranty Period: 30 Months After The Date Of Delivery

View

Bidding

Gem Registration

Download

#TBD : 31638412
24 Days Left
Railway Transport
Punjab
Ref. Document
Due on : 14 May, 2024

Supply of Set Of Ss Chequred Sheet 1.7Mm Thick. For Flooring Of Lhb Parcel Van Co Aches., As Per Drawing: Mi007604 Alt Nil Without Item 12, 17, 18 & 20, Packing Instruction: As Per Sta Ndard Packing. It Should Be Ensured That Item Should Not Rub During Transportati On. The Item Should Be Packed With Adequate Strength. Transit Damage, If Any, Shal L Be At The Cost Of Supplier. Warranty Period: 30 Months After The Date Of Delivery

View

Bidding

Gem Registration

Download

#TBD : 31637477
9 Days Left
Railway Transport
Punjab
Ref. Document
Due on : 29 Apr, 2024

Supply of Accessories Of Roof Water Tank 30L To Drg No. Lw63150 Alt E W/O Item No. 1 Follow Packing Instruction No.Pi 172 Version 4 Warranty Period: 30 Months After The Date Of D Elivery

View

Bidding

Gem Registration

Download

#TBD : 31639786
41 Days Left
Railway Transport
Punjab
Ref. Document
Due on : 31 May, 2024

Supply Of Automatic Fire Detection Cum Suppression System For Lhb Power Car And Pantry Car Coaches, Installation & Commissioning Inclusive As Per Drawing: Rdso Spec.R Dso/2013/Cg-06 Rev.02 With Amendment Slip No. 1 Of February-2020, Packing Instruction: As Pe R Standard Packing. It Should Be Ensured That Item Should Not Rub During Transpo Rtation. The Item Should Be Packed With Adequate Strength. Transit Damage, If Any, Shall Be At The Cost Of Supplier. Warranty Period: 48 Months After The Date Of Delivery

View

Bidding

Gem Registration

Download

#TBD : 31638940
10 Days Left
Railway Transport
Punjab
Ref. Document
Due on : 30 Apr, 2024

Supply of Sodium Picosulphate 1Mg/Ml 100 Ml Syrup

View

Bidding

Gem Registration

Download