#TBD : 35167687
0 Days Left
Water Supply And Drainage
Punjab
Ref. Document
Due on : 25 Aug, 2025
Remaining Balance Work Left By Spcl-kipl Jv As Per Scope Of Work For Commissioning Of 5 Mld Capacity Stp At Dhuri Based On Sbr Technology Including Operation And Maintenance For A Period Of 60 Months After Stabilization Period Of 3 Months Or More.
#TBD : 35140967
2 Days Left
Water Supply And Drainage
Punjab
53.16 Lacs
Due on : 28 Aug, 2025
Special Repair At 20 Mld Stp And 8 Mld Stp At North Side Of Phagwara Town
#TBD : 35167870
1 Days Left
Water Supply And Drainage
Punjab
1.09 Crore
Due on : 27 Aug, 2025
Providing And Laying Of Water Supply And Sewerage Lines In Various Area At Banur..
#TBD : 35159570
23 Days Left
Water Supply And Drainage
Punjab
19.74 Crore
Due on : 18 Sep, 2025
Providing Sewerage Scheme, Construction Of Main Pumping Station, Sewage Treatment Plant, Rising Main, Offtake Chamber And Deep Manhole Cum Screening Chamber Under Sbm-2.0
#TBD : 35159563
0 Days Left
Water Supply And Drainage
Punjab
Ref. Document
Due on : 25 Aug, 2025
Special Repair Of Sewerage Treatment Plant 12 Mld Capacity On Sbr Technology
#TBD : 35164393
8 Days Left
Water Supply And Drainage
Punjab
1.69 Crore
Due on : 03 Sep, 2025
Providing And Laying Of Sewerage System From Mind Tree School To Toward Ludhiana Chandigarh National Highway 05 And Dismantling Of Roads And All Other Works Contingent Thereto At Kharar Distt Mohali.
#TBD : 35163119
0 Days Left
Water Supply And Drainage
Punjab
Ref. Document
Due on : 25 Aug, 2025
Remaining Balance Work Left By Spcl-kipl Jv As Per Scope Of Work For Commissioning Of 5 Mld Capacity Stp At Dhuri Based On Sbr Technology Including Operation And Maintenance For A Period Of 60 Months After Stabilization Period Of 3 Months Or More.
#TBD : 35165627
0 Days Left
Water Supply And Drainage
Punjab
Ref. Document
Due on : 25 Aug, 2025
Rate Contract For Rehabilitation Of Existing Sewer Lines By Desilting/Cleaning With Jetting Cum Suction Sewer Cleaning Machine With Water Recycling Technology Or Super Sucker Cum Jetting Machine Or Any Improved Mechanized System Including Cctv
#TBD : 35167761
0 Days Left
Water Supply And Drainage
Punjab
Ref. Document
Due on : 25 Aug, 2025
P/L Rcc Np3 Main Gravity Sewer Line, Const Of Mps Of 67.50 Mld, 900 Mm I/D Pumping Main From Proposed Mps To 30 Mld Stp, Stp Of Capacity 30 Mld Including 5 Years O And M Of Mps And Stp, P/L Treated Water Pipeline Form Cct To Disposal Point At Moga
#TBD : 35140800
1 Days Left
Water Supply And Drainage
Punjab
20.77 Lacs
Due on : 27 Aug, 2025
Providing And Fixing Of Silent 100kva Dg Set At Main Pumping Station Shahkot Town,