#TBD : 31500628
0 Days Left
Water Supply And Drainage
Punjab
37.10 Lacs
Due on : 26 Mar, 2024
Drilling And Development Of 1 No. New Tubewell Of Size 300Mm X 200Mm Upto 300 Mtr. Depth Or Where Sufficient Quantity Of Potable Water Is Available Complete And All Other Works Contingent Thereto In W.No.3 At Kharar
#TBD : 31481413
0 Days Left
Water Supply And Drainage
Punjab
Ref. Document
Due on : 09 Apr, 2024
O And M Sewerage Scheme Of Batala Town 2024-2025 W.E.F. 01.04.2024 To 31.03.2025 Period Of 12 Months
#TBD : 31500498
0 Days Left
Water Supply And Drainage
Punjab
Ref. Document
Due on : 24 Apr, 2024
Fabrication, Manufacturing, Testing, Supplying, And Commissioning Of 726 Nos. Of Machinery For Cleaning Underground Sewer Lines And Manholes In 150 Nos. Of Ulbs In The State Of Punjab, In All Respect Under Sbm 2.0
#TBD : 31482469
0 Days Left
Water Supply And Drainage
Punjab
Ref. Document
Due on : 01 Apr, 2024
O and m Of 17.3 Mld Sewerage Treatment Plant And Main Pumping Station At Zirakpur. For The Year 2024-2027
#TBD : 31500613
0 Days Left
Water Supply And Drainage
Punjab
Ref. Document
Due on : 03 Apr, 2024
Oandm Of Disposal Work Raj Nagar, Mojowal, Sharma Store Nangal, Indira Colony Nikku Nangal, Barari, Maida Majra, Rampur Sahni 15.00 Mld Mps Barari, 1.00 Mgd Wtp Mojowal Road, 1.00 Mgd Wtp Sharma Store, Well At Various Places At Nangal
#TBD : 31494128
0 Days Left
Water Supply And Drainage
Punjab
34.16 Lacs
Due on : 26 Mar, 2024
Drilling And Deve. Of 1 No. New Tube Well Of Size 300Mm X 200Mm Upto 150 Mtr. Depth Or Where Sufficient Quantity Of Potable Water Is Available Complete And All Other Works Contingent Thereto In Indira Nagar Ward No. 5 In Community Center Nangal
#TBD : 31483195
0 Days Left
Water Supply And Drainage
Punjab
5.43 Crore
Due on : 09 Apr, 2024
Providing And Laying Of Rcc Np-3 Pipes Sewer, Upvc Pipe Sewer, Di K-7 Pipe, Rising Main And Construction Of Mps And All Other Works Contingent Thereto Complete In All Respects At Bhai RupaUnder Sbm 2.0
#TBD : 31483845
0 Days Left
Water Supply And Drainage
Punjab
24.98 Lacs
Due on : 05 Apr, 2024
Desilating Of Existing Sewer Lines In Various Streets By Mechanized System Using Super Sucker And All Other Works Contingency Thereto At Focal Point Khanna Town
#TBD : 31500697
0 Days Left
Water Supply And Drainage
Punjab
39.18 Lacs
Due on : 26 Mar, 2024
Drilling And Development Of 1 No. New Tube Well Of Size 300Mm X 200Mm Upto 150 Mtr. Depth Or Where Sufficient Quantity Of Potable Water Is Available Complete And All Other Works Contingent Thereto In Indira Nagar In Kiln Area Ward No. 5 Nangal
#TBD : 31494237
0 Days Left
Water Supply And Drainage
Punjab
Ref. Document
Due on : 24 Apr, 2024
Fabrication, Manufacturing, Testing, Supplying, And Commissioning Of 4 Nos. Of Super Suction Machines For Cleaning Underground Sewer Lines In 150 Nos. Of Ulbs In The State Of Punjab Including 12 Months Of Operation And Maintenance Under Sbm 2.0