#TBD : 35185722
17 Days Left
Education And Research Institutes
Chandigarh
1.60 Lacs
Due on : 09 Sep, 2025
Removal Of Dangerous Dead And Dry Trees Standing In P.u. Campus Sector 14 And 25 Posing Danger To Life And Property
#TBD : 35017706
0 Days Left
Education And Research Institutes
Chandigarh
20.00 Lacs
Due on : 18 Aug, 2025
Design Supply Installation Testing And Commissioning Of Solar Panel34.20 Kwp Grid Interactive Roof Top Solar Voltaic Power System Including Space Frame At Multipurpose Auditorium In Panjab University South Campus Sector-25
#TBD : 35185804
17 Days Left
Education And Research Institutes
Chandigarh
14.96 Lacs
Due on : 09 Sep, 2025
Lifting And Disposal Of Garbage From P.U. Campus To Dumping Ground By Hiring One Tractor Trolley
#TBD : 35017740
0 Days Left
Education And Research Institutes
Chandigarh
Ref. Document
Due on : 14 Aug, 2025
Electrical Installation For Renovation Of Chairperson Room, Adjacent Pa Room, Store Office Of Chemistry Department In Pu Campus, Sector-14
#TBD : 35185643
12 Days Left
Education And Research Institutes
Chandigarh
14.00 Lacs
Due on : 04 Sep, 2025
Civil Work Sitc Of Fire Fighting System Down Comer System As Per Nbc Part 4 At Calem Building Emerging Area In Sciences And Technology Block Ii In Pu South Campus Sector 25 Chandigarh.
#TBD : 35080942
0 Days Left
Education And Research Institutes
Punjab
Ref. Document
Due on : 21 Aug, 2025
Ei For Creation Of Infrastructure Archival Lab, Digital Recording Lab, Oral History Record Room For The Care And Conservation Of Manuscript Rare Books, Old And Rare Documents And Records Of History At The 5th Floor Of A.c. Joshi Library In P.u Campus
#TBD : 35017694
0 Days Left
Education And Research Institutes
Chandigarh
1.60 Lacs
Due on : 19 Aug, 2025
Removal Of Dangerous Dead And Dry Trees Standing In P.u. Campus Sector 14 And 25 Posing Danger To Life And Property
#TBD : 35080948
4 Days Left
Education And Research Institutes
Punjab
Ref. Document
Due on : 27 Aug, 2025
Manufacturing, Printing And Supplying Of Blank Answer Books Of 12 And 40 Pages Both Without Omr
#TBD : 35185736
17 Days Left
Education And Research Institutes
Punjab
9.56 Lacs
Due on : 09 Sep, 2025
Water Proofing Treatment Of Roof Connecting To Corridor For Auditorium Building At P.u. Extension Library, Ludhiana.
#TBD : 35080860
3 Days Left
Education And Research Institutes
Punjab
6.63 Lacs
Due on : 26 Aug, 2025
Provision Of Cupboards In Lab No. 113 And 115 In Department Of U.i.p.s. In P.u. Campus, Sector-14, Chandigarh.