#TBD : 31654199
13 Days Left
Power Plant
Uttaranchal
Ref. Document
Due on : 09 May, 2024
Augmentation Of 132 Kv Substation Laksar From 3X40 Mva Transformer To 2X40 Mva +1X80 Mva Transformer At 132/ Kv Voltage Level
#TBD : 31636143
10 Days Left
Power Plant
Uttaranchal
Ref. Document
Due on : 06 May, 2024
Shifting Of 66 Kv Kothiyalsain – Joshimath Transmission Line Near Ntpc Campus Animath
#TBD : 31653783
13 Days Left
Power Plant
Uttaranchal
Ref. Document
Due on : 09 May, 2024
Supply, Erection, Testing And Commissioning Of 125 Mvar Reactor Along With Its Associated Bay And Related Work At 400 Kv Substation Kashipur
#TBD : 31629016
7 Days Left
Power Plant
Uttaranchal
Ref. Document
Due on : 03 May, 2024
Renovation And Modernization Of Offices Of The Engineer, Executive Engineer And All Technical And Clerical Staff, Superintendence With Conference Hall Cum Training Center With Field Hostel
#TBD : 31653795
13 Days Left
Power Plant
Uttaranchal
Ref. Document
Due on : 09 May, 2024
Construction Of 400 Kv Gis Switching Substion Pipalkoti
#TBD : 31654207
14 Days Left
Power Plant
Uttaranchal
Ref. Document
Due on : 10 May, 2024
Replacement Of Old Wolf, Panther Conductor With Accc Htls Conductor Of 132 Kv Laksar Manglore Line
#TBD : 31653759
7 Days Left
Power Plant
Uttaranchal
Ref. Document
Due on : 03 May, 2024
Raising Of Boundary Wall At 132 Kv Substation Majra
#TBD : 31654221
10 Days Left
Power Plant
Uttaranchal
Ref. Document
Due on : 06 May, 2024
Construction Of 132 And 66 Kv Bays And Installation Of 3X20 Mva, 132/66 Kv Transformers At 132 Kv Substation Simli
#TBD : 31654228
17 Days Left
Power Plant
Uttaranchal
Ref. Document
Due on : 13 May, 2024
Procurement Of Emergency Restoration System At The Divisional Store Of 400 Kv Substation
#TBD : 31653635
13 Days Left
Power Plant
Uttaranchal
Ref. Document
Due on : 09 May, 2024
Construction Of 400 Kv D/C Vishnugad Pipalkoti Hep To 400Kv Switching Substation Pipalkoti Transmission Line