#TBD : 31532441
5 Days Left
Power
Orissa
45.75 Lacs
Due on : 03 Apr, 2024
Providing Srpbt
Concertina Helix Coil
Fencing On Both Sides Of
The Penstock Pipe Lines
From Valve House To
Power House
#TBD : 31525075
0 Days Left
Power
Orissa
27.52 Lacs
Due on : 28 Mar, 2024
Renovation Of Sewerage System, Approach Road And Replacement Of Windows In Navjeevan Colony, Hhep, Burla
#TBD : 31525255
7 Days Left
Power
Orissa
Ref. Document
Due on : 05 Apr, 2024
Replacing Glass Brick Of Power House Main Building Providing With 6-12-6Mm Insulated Toughen Glass With Fitting And Fixing By Extruded Aluminium Section At Power House Of Uihep, Mukhiguda
#TBD : 31511938
12 Days Left
Power
Orissa
68.91 Crore
Due on : 10 Apr, 2024
Project Management Consultancy For Pre-Construction, Tender Award, Execution, Closure And Handing Over Works Of 600 Mw Upper Indravati Pumped Storage Project
#TBD : 31517714
4 Days Left
Power
Orissa
5.60 Lacs
Due on : 02 Apr, 2024
Repair And Renovation Of Flooring With Pvc Mf 2Mm Hetero Tiles With Replacement Of Covers Of Cable Trench Inside The Room With Ms Chequered Plate At 11 Kv New Switchgear Room Of Bhep, Balimela And Laying Of Paver Blocks In Front Of The Room
#TBD : 31499799
0 Days Left
Power
Orissa
Ref. Document
Due on : 28 Mar, 2024
Replacing Glass Brick Of Valve House Main Building Providing With 6-12-6Mm Insulated Toughen Glass With Fitting And Fixing By Extruded Aluminium Section At Valve House Of Uihep, Mukhiguda