#TBD : 31522460
0 Days Left
Water Supply And Drainage
West Bengal
32.15 Lacs
Due on : 27 Mar, 2024
Annual Maintenance Contract In Connection With Manual Cleaning Of The Trash Racks At Fore Bay Bridge Of 3Rd Additional Chowbhaga Pumping Station Under M.D.M.D At Paschim Chowbhaga, P.S. Anandapur
#TBD : 31478563
0 Days Left
Water Supply And Drainage
West Bengal
18.90 Lacs
Due on : 02 Apr, 2024
Maintenance Repair Work Of Vt Pumps And Allied Mechanical Work Of Vt Pumps At Bagjola Pumping Station, Under M.D.M.D. Block Ps- Haroa, Kultigong
#TBD : 31478358
0 Days Left
Water Supply And Drainage
West Bengal
7.84 Lacs
Due on : 02 Apr, 2024
Maintenance Repair Work Of Vt Pumps And Allied Mechanical Work At Kurebhanga Pumping Stations Under M.D.M.D. Ps-Canning, Block- Canning All In The
#TBD : 31478551
0 Days Left
Water Supply And Drainage
West Bengal
44.91 Lacs
Due on : 02 Apr, 2024
Maintenance Repair Work Of Vt Pumps And Allied Mechanical Work At Uttarbhag Pumping Station, Addl Uttarbhag Pumping Station
#TBD : 31461468
0 Days Left
Water Supply And Drainage
West Bengal
22.53 Lacs
Due on : 26 Mar, 2024
Annual Maintenance Contract Amc In Connection Annual Maintenance Contract Amc In Connection With Operations Maintenance Of Vt Pumps Ups And 2Nd Aups And Running Routine Maintenance Of 33Kv Sub- Stations Under M.D.M.D. Ps- Baruipur
#TBD : 31461415
0 Days Left
Water Supply And Drainage
West Bengal
12.06 Lacs
Due on : 26 Mar, 2024
Annual Maintenance Contract In Connection With Operation And Running Routine Maintenance Of Vt Pumps With Allied Electro -Mechanical Work At Kurebhanga Pumping Station Under M.D.M.D, P.S. And Block
#TBD : 31461838
0 Days Left
Water Supply And Drainage
West Bengal
12.06 Lacs
Due on : 26 Mar, 2024
Annual Maintenance Contract In Connection With Operations Maintenance Repair Work Of Vt Pumps At Additional Uttarbhag Pumping Station Under M.D.M.D. Ps- Baruipur, Block
#TBD : 31462240
0 Days Left
Water Supply And Drainage
West Bengal
Ref. Document
Due on : 23 Mar, 2024
Supply of 3 Multifunction Machines Mfm Q2
#TBD : 31462632
0 Days Left
Water Supply And Drainage
West Bengal
5.34 Lacs
Due on : 21 Mar, 2024
Annual Maintenance Contract Amc In Connection With Operations And Maintenance Of Fountain Sprinkler Irrigations System With Alied Electrical Works On Both The Embankment Of Kestopur Khal At A Stretch Of 2 Km, Starting From Golaghata Footbridge Of P
#TBD : 31407282
0 Days Left
Water Supply And Drainage
West Bengal
Ref. Document
Due on : 27 Mar, 2024
Construction Of Wooden Bridge At Mukutsila More, Krishnanagar Over H.T.C. Khaal At G.P.- Heria In Block