#TBD : 33443481
0 Days Left
Power Plant
West Bengal
4.45 Crore
Due on : 09 Dec, 2024
Supply Of Distribution Transformers As Per Is 1180 Part I 2014 With Energy Efficiency Level 2.
#TBD : 32857073
0 Days Left
Power Plant
Manipur
98.27 Lacs
Due on : 09 Oct, 2024
Supply Of Acsr Conductor Rabbit Required For Operation And Maintenance Works In Manipur.
#TBD : 33108453
0 Days Left
Power Plant
Manipur
2.02 Crore
Due on : 08 Nov, 2024
Supply And Erection For Replacement Of Existing Panther Conductor Of 33Kv Iroisemba-Khuman D/C Mini Tower Line From Loc No. 57/0 To 63/0 With Covered Panther Conductor On Turnkey Basis.
#TBD : 33649721
0 Days Left
Power Plant
Manipur
5.05 Crore
Due on : 17 Jan, 2025
Supply Of Distribution Transformer As Per Latest Amendment Amendment No. 4 Of Is 1180 Part I 2014 With Energy Efficiency Level 2 2 Star Rating
#TBD : 32371850
0 Days Left
Power Plant
Manipur
98.27 Lacs
Due on : 16 Aug, 2024
Supply Of Acsr Conductor Rabbit Required For O And M Works In Manipur
#TBD : 33828333
0 Days Left
Power Plant
Manipur
Ref. Document
Due on : 10 Feb, 2025
Tender For Supply, Installation And Commissioning Of 40 Nos, Of High Mast Of 20Mtr Along With 8 Fittings Each Of 300 Watt Of Led Integral Flood Light At Different Locations In Manipur From The Original Equipment Manufacturers Oem Of High Mast/Luminaries Or Its Authorized Dealers
#TBD : 32371562
0 Days Left
Power Plant
Manipur
4.43 Crore
Due on : 16 Aug, 2024
Supply Of Xlpe Insulated Ab Cables With Insulated Messenger Cum Neutral Wire Of Various Sizes Required For Operation And Maintenance Of Mspdcl.
#TBD : 32900543
0 Days Left
Power Plant
Manipur
Ref. Document
Due on : 01 Oct, 2024
Supply Of White Maplitho Paper Sheet And Reel, 70 Gsm And 80 Gsm To The Board.
#TBD : 33732457
0 Days Left
Power Plant
Manipur
Ref. Document
Due on : 27 Jan, 2025
Supply And Delivery Of 11Kv, Ht, Xlpe Heat Shrinkable Cable Jointing Kit I120 Sq.Mm, 3 Core Cable, Type Indoor And Outdoor Ii 150 Sq.Mm, 3 Core Cable, Type Indoor And Outdoor.
#TBD : 32371728
0 Days Left
Power Plant
Manipur
3.96 Crore
Due on : 16 Aug, 2024
Supply Of 8M And 9M Swaged Stp Required For Operation And Maintenance Of Mspdcl.