#TBD : 35177762
5 Days Left
Construction
Uttar Pradesh
4.94 Crore
Due on : 28 Aug, 2025
Construction Of 3 Nos. Road Intersection Hanuman Setu, Nishatganj Bridge And Kukrail River Bridge In Lucknow Green Corridor On Epc Basis
#TBD : 35148778
3 Days Left
Construction
Uttar Pradesh
Ref. Document
Due on : 26 Aug, 2025
Median Divider From Km 0.00 To Km 4.100 From Kamta To U.p.r.n.n Under Pass On Shaheed Path, Industrial Strengthening Of Side Slopes, Beautification Along With Installation Of Chain Link Fencing On Side Slopes, Boring For Irrigation, Establishment Of Control Room/pump Room
#TBD : 35158822
3 Days Left
Construction
Uttar Pradesh
Ref. Document
Due on : 26 Aug, 2025
Central Median Divider From Km 17.60 To Km 23.00 From South City To Kanpur Road On Shaheed Path, Industrial Strengthening Of Side Slopes, Chain Link Fencing On Side Slopes As Well As Beautification, Boring For Irrigation, Establishment Of Control Room/pump Room,
#TBD : 35158847
2 Days Left
Construction
Uttar Pradesh
Ref. Document
Due on : 25 Aug, 2025
Selection For Operation And Maintenance Of Community Centre At Sudarshanpuri Aishbagh
#TBD : 35146314
3 Days Left
Construction
Uttar Pradesh
Ref. Document
Due on : 26 Aug, 2025
Planting Of Colourful Plants Of Different Species Along The Road Side And On The Way To The Reservoir Along With 12 Months Up To Date Maintenance Work Of Part 1 Of The Park.
#TBD : 35150505
5 Days Left
Construction
Uttar Pradesh
57.61 Crore
Due on : 28 Aug, 2025
Construction Of 4 Lane Bridge Across Gomti River From G20 Road To Armyland Rotary On Epc Basis
#TBD : 35147692
3 Days Left
Construction
Uttar Pradesh
Ref. Document
Due on : 26 Aug, 2025
Planting Of Ground Cover Colourful Plants Of Different Species Along The Road Side And Pathways Of Water Body Along With Aesthetic Maintenance Work Of Part 3 Of The Park For 12 Months
#TBD : 35148397
3 Days Left
Construction
Uttar Pradesh
Ref. Document
Due on : 26 Aug, 2025
Planting Of Ground Cover Colourful Plants Of Different Species Along The Road Side And Pathway Of Water Body Along With Up To Date Maintenance Work Of Part 2 Of Park For 12 Months
#TBD : 35171592
3 Days Left
Construction
Uttar Pradesh
Ref. Document
Due on : 26 Aug, 2025
Repair Work Of Pump Houses Situated In Various Sectors Under Basant Kunj Yojana
#TBD : 35148702
3 Days Left
Construction
Uttar Pradesh
Ref. Document
Due on : 26 Aug, 2025
Work Of Making Rose World In Part 4 Of Jmp And Planting Of Ground Cover Colourful Plants Of Different Species Along With Pathways Of Rose Side Or Water Body In Part 4 And Ecological Maintenance Work Of Part 4 Of The Park. For 12 Months