#TBD : 33506890
0 Days Left
Power
Sikkim
32.41 Lacs
Due on : 20 Dec, 2024
Renovation Of Office Space At 2Nd Floor Left Wing Of Administrative Building Of Teesta V Power Station, Balutar, Sikkim
#TBD : 33308354
0 Days Left
Power
Sikkim
4.64 Crore
Due on : 05 Dec, 2024
Construction Of Retaining Wall In U/S And D/S Of Permanent Steel Bridge 70R At Right Bank Of River Teesta
#TBD : 33308352
0 Days Left
Power
Sikkim
32.41 Lacs
Due on : 05 Dec, 2024
Renovation Of Office Space At 2Nd Floor Left Wing Of Administrative Building Of Teesta V Power Station
#TBD : 33507333
0 Days Left
Power
Sikkim
4.64 Crore
Due on : 20 Dec, 2024
Construction Of Retaining Wall In U/S And D/S Of Permanent Steel Bridge 70R At Right Bank Of River Teesta In Teesta-Vi He Project Pamphok, Sikkim
#TBD : 33305227
0 Days Left
Power
Sikkim
10.08 Lacs
Due on : 25 Nov, 2024
Monthly Basis Cab And Taxi Hiring Service - Without Fuel - Muv; Mahindra Bolero Camper; 2023 Or Higher; 0-25 000 Kms; Ac; 24
#TBD : 33546075
0 Days Left
Power
Sikkim
3.70 Lacs
Due on : 02 Jan, 2025
Cleaning Of Jungle Bushes, Removal Of Deposited Soil And Providing Re-Connection Of Water Supply Pipe Line From Main Storage Water Tank To Field Hostel, Type-C And Administrative Building At Pamphok, Teesta-Vi H E Project, Sikkim
#TBD : 32969979
0 Days Left
Power
Sikkim
1.89 Lacs
Due on : 11 Oct, 2024
Supply of 20 Stationary Valve Regulated Lead Acid Batteries V2 As Per Is 15549 Q3
#TBD : 33183712
0 Days Left
Power
Sikkim
10.33 Lacs
Due on : 04 Nov, 2024
Monthly Basis Cab And Taxi Hiring Service - Without Fuel - Suv; Mahindra Bolero; 2023 Or Higher; 0-25 000 Kms; Ac; 24
#TBD : 33699150
0 Days Left
Power
Sikkim
Ref. Document
Due on : 23 Jan, 2025
Supply of Hard Disk Drive For Nas
#TBD : 33061615
0 Days Left
Power
Sikkim
4.25 Lacs
Due on : 21 Oct, 2024
Supply of 1 Network Attached Storage Nas Device Q4