#TBD : 31255592
0 Days Left
Education And Research Institutes
Haryana
35.00 Lacs
Due on : 21 Mar, 2024
Supply, Installation, Testing And Commissioning For
Research Grade Bioreactor Supply, Installation, Testing And Commissioning For Research Grade Bioreactor
#TBD : 30614619
0 Days Left
Education And Research Institutes
Haryana
13.00 Lacs
Due on : 18 Jan, 2024
Supply Purchase Of Electrical Material Fan And Fixtures For Construction Branch Store At Kurukshetra University Kurukshetra.
#TBD : 30614827
0 Days Left
Education And Research Institutes
Haryana
88.37 Lacs
Due on : 18 Jan, 2024
Supply, Installation, Testing And Commissioning Of Lifts In Three Buildings At Kuk
#TBD : 31012333
0 Days Left
Education And Research Institutes
Haryana
15.33 Lacs
Due on : 01 Mar, 2024
Supply, Erection, Testing, Commissioning Of 400 Kva Capacity Transformer With Allied Items Near Faculty Lounge Building To Feed The Power Supply To Faculty Lounge Building, Old Arts Faculty Building And Education Department Building At Kuk.
#TBD : 31255852
0 Days Left
Education And Research Institutes
Haryana
25.00 Lacs
Due on : 21 Mar, 2024
Supply, Installation, Testing And Commissioning For
Research Grade Hplc Supply, Installation, Testing And Commissioning For Research Grade Hplc
#TBD : 31255137
0 Days Left
Education And Research Institutes
Haryana
30.00 Lacs
Due on : 21 Mar, 2024
Supply, Installation, Testing And Commissioning For
Research Grade Soil Gas Flux System Supply, Installation, Testing And Commissioning For Research Grade Soil Gas Flux System
#TBD : 31369310
0 Days Left
Education And Research Institutes
Haryana
30.00 Lacs
Due on : 29 Mar, 2024
Supply, Installation, Testing And Commissioning For
Research Grade Portable Photosynthesis System Irga Supply, Installation, Testing And Commissioning For Research Grade Portable Photosynthesis System Irga
#TBD : 30325645
0 Days Left
Education And Research Institutes
Haryana
88.37 Lacs
Due on : 08 Jan, 2024
Supply, Installation, Testing And Commissioning Of Lifts In Three Buildings At Kuk
#TBD : 31644050
13 Days Left
Education And Research Institutes
Haryana
75.00 Lacs
Due on : 09 May, 2024
Sale Of Raddi I.E Used Answer Books, Used Question Papers, Supdt. Last Pkts And Dissertation/Project Training Reports Etc.
#TBD : 30530186
0 Days Left
Education And Research Institutes
Haryana
2.40 Crore
Due on : 08 Jan, 2024
Design Supply Installation Testing And Commissioning Of Rooftop Grid Connected Solar Power Plant With Net Metering Facility 500 Kwp Capacity Above 10 Kwp And Up To 100 Kwp On Roofs Of Various Boys And Girls Hostel At Kuk