#TBD : 34643382
4 Days Left
Construction
West Bengal
4.25 Lacs
Due on : 20 Jun, 2025
Maintenance Including Switching On, Off Operation Of Street Light Installations For The Year 2025-26
#TBD : 34628987
7 Days Left
Construction
West Bengal
14.56 Lacs
Due on : 23 Jun, 2025
Conversion Of Abandoned Culvert To A Pedestrian Underpass Near Satyajit Ray Flim Institute On Em Bye Pass Electro-Mechanical Works 06/Ee/Ed-Iii/Em/Kmda Of 2025-26 Dated 28/05/2025
#TBD : 34645632
21 Days Left
Construction
West Bengal
1.34 Crore
Due on : 07 Jul, 2025
Construction Of Electric Crematorium Of Double Furnace Of Jagadishpur Within Uluberia Municipality Along With Allied Works Civil Part
#TBD : 34630153
14 Days Left
Construction
West Bengal
Ref. Document
Due on : 30 Jun, 2025
Overhauling Of Pump No 2 Model 24uph3, Q 3412 Cum Per Hr, Head 23 Mtr, Make Kbl And Motor No 3 6 Kv, 325 Kw, 591 Rpm, Make Cg.......at Rwps Inside The Campus Of Indian Botanical Garden Ibg Under Howrah Municipal
#TBD : 34643594
7 Days Left
Construction
West Bengal
2.41 Lacs
Due on : 23 Jun, 2025
Repairing And Overhauling Of Gear Box Assembly, Agitator And Scrapper Unit And Other Allied Works Of Mechanical Flocculator Mf No. 1, 3 And 6
#TBD : 34630727
2 Days Left
Construction
West Bengal
3.40 Lacs
Due on : 18 Jun, 2025
Roof Treatment Work By Screed Concrete And Laying App At Roof Of Block No. 1 Fl No-25, 27, 28, Bl-02 Fl No. 16, Bl-21 Fl No. 31, 32 Bl-15 Fl No. 15 And Replacement And Renewing Of Old Damaged App By New App At Bl-8 Fl No. 25 To 32
#TBD : 34627533
4 Days Left
Construction
West Bengal
4.81 Lacs
Due on : 20 Jun, 2025
Dismantling Of Endanger Portion And Reconstruction Of The Boundary Wall Along With Allied Civil Work At Erstwhile Kit Scheme Fish Market, Pre. No. 19A/2, Ultadanga Main Road Under Housing Sector, Kmda Kmda/Housing /Ee/ Div-Iii/Circle I /Nit-08/2025-2026
#TBD : 34627902
15 Days Left
Construction
West Bengal
19.73 Crore
Due on : 01 Jul, 2025
Construction Of Storm Water Rcc Box Drain Starting From Wireless More To Noai Khal Of Barasat- Barrackpore Road. 08/Sep/W And S/Kmda Of 2025-2026
#TBD : 34644438
21 Days Left
Construction
West Bengal
1.16 Crore
Due on : 07 Jul, 2025
Construction Of Electric Crematorium Building In Single Unit With Modification And Up Gradation Of Old Furnace At Hatishala Burning Ghat Crematorium Under Baidyabati Municipality Civil Part
#TBD : 34628232
0 Days Left
Construction
West Bengal
2.62 Lacs
Due on : 16 Jun, 2025
Repairing Of Fountains And Allied Works Near Ashoke Malhotra Cricket Academy Within Rabindra Sarabar, Kolkata 05/Ee/Ed-Iii/Em/Kmda Of 2025-26 Dated 28/05/2025