#TBD : 34424334
6 Days Left
Water Supply And Drainage
Kerala
1.42 Crore
Due on : 07 May, 2025
Supply, Installation, Trial Running And Commissioning Of 3600 Bph 600 Ml Carbonated Soft Drink Packing Line For Pet Bottles -general Mechanical Work
#TBD : 33559536
0 Days Left
Water Supply And Drainage
Kerala
3.15 Crore
Due on : 03 Jan, 2025
Construction Of Check Dam Cum Bridge Across Palkulam Thodu-And Allied Works Near Seminarypadi In Ward 2 Of Vazhathope Panchayat-General Civil Work
#TBD : 34421647
6 Days Left
Water Supply And Drainage
Kerala
42.51 Lacs
Due on : 07 May, 2025
Maintenance Work At Hilly Aqua Aruvikkara-manufacturing, Supply, Installation, Trial Running And Commissioning Of Fully Automatic Prefiltration Systemro At Hilly Aqua Packaged Drinking Water Plant At Aruvikkara- General Mechanical Work
#TBD : 33519379
0 Days Left
Water Supply And Drainage
Kerala
7.39 Lacs
Due on : 21 Dec, 2024
Construction Of Open Stage On The Right Bank Of Anjarakandy Rcl-At Paraparam In Pinarayi Panchayath, Kannur District-General Civil Work
#TBD : 34356212
0 Days Left
Water Supply And Drainage
Kerala
42.51 Lacs
Due on : 22 Apr, 2025
Maintenance Work At Hilly Aqua Aruvikkara - Manufacturing, Supply, Installation , Trial Running And Commissioning Of Fully Automatic Prefiltration Systemro At Hilly Aqua Packaged Drinking Water Plant At Aruvikkara- General Mechanical Work
#TBD : 34268333
0 Days Left
Water Supply And Drainage
Kerala
53.28 Lacs
Due on : 08 Apr, 2025
It Was Decided That Installing Fully Automatic Prefiltration Systemro At Hilly Aqua Packaged Drinking Water Plant Aluva For Improving The Quality Of Water. General-hilly Aqua Bottling Plant Aluva- 20 Litre Jar Production Line 600 Jph General Mechanical Work
#TBD : 34039845
0 Days Left
Water Supply And Drainage
Kerala
8.55 Lacs
Due on : 03 Mar, 2025
#TBD : 33583180
0 Days Left
Water Supply And Drainage
Kerala
4.52 Crore
Due on : 06 Jan, 2025
Construction Of Vented Cross Bar Vcb Cum Causeway Across Periyar River Near Vellakkayam In Ward No. 10 And Pallikkavala In Ward No. 5 Of Vazhathoppu Gp-And Protecting Both Bank Of Cheruthoni River -General Civil Work
#TBD : 33583163
0 Days Left
Water Supply And Drainage
Kerala
4.13 Crore
Due on : 06 Jan, 2025
Construction Of Check Dam Cum Bridge Across Chinnar River Kiifb-Construction Of Check Dam Cum Bridge Across Chinnar River Madampadi In Ward No 8 Of Vathikkudy Panchayath And Ward No 1 Of Nedumkandom Panchayath-General Civil Work
#TBD : 34272251
0 Days Left
Water Supply And Drainage
Kerala
41.68 Lacs
Due on : 08 Apr, 2025
General-hilly Aqua Bottling Plant Aluva Manufacturing, Supply, Installation, Trial Running And Commissioning Of Fully Automatic Prefiltration System Ro-general Mechanical Work