#TBD : 31562649
0 Days Left
Power Plant
Karnataka
1.19 Crore
Due on : 02 Apr, 2024
Construction Of 2 Nos Of 11Kv Link Line From110/33/11Kv Mantur In Sub Division For A Distance Of 10.97 Km In On Total Turn Key And Lumpsum Basis.
#TBD : 31562652
0 Days Left
Power Plant
Karnataka
2.56 Crore
Due on : 15 Apr, 2024
Construction Of 5Nos Of 11Kv Link Line From Various Substation 110/11Kv Shirol For A Distance Of 55.67Km In On Total Turn Key And Lumpsum Basis.
#TBD : 31562626
0 Days Left
Power Plant
Karnataka
1.25 Crore
Due on : 02 Apr, 2024
Construction Of 6 Nos Of 11Kv Link Line From Proposed Hanamapur Substation&1 No From 110/11Kv Yallammanwadi In Athani Division For A Distance Of 23.6 Km In Athani Division On Total Turn Key And Lumpsum Basis.
#TBD : 31562642
0 Days Left
Power Plant
Karnataka
90.76 Lacs
Due on : 02 Apr, 2024
Construction Of 3Nos Of 11Kv Link Lines From Existing 33/11 Kv Muss Kaginele And 33/11 Kv Muss Arabgonda Sub Stations For A Distance Of26.6Km Inbyadagi L Division On Total Turn Key And Lumpsum Basis.
#TBD : 31556431
0 Days Left
Power Plant
Karnataka
Ref. Document
Due on : 30 Mar, 2024
Procurement Of Safety Materials
#TBD : 31556439
0 Days Left
Power Plant
Karnataka
Ref. Document
Due on : 15 Apr, 2024
Manufacture & Supply Of Sheet Metal Type Lt Distribution Box For 100Kva & 250Kva Dtc With Mccbs.
#TBD : 31556445
0 Days Left
Power Plant
Karnataka
Ref. Document
Due on : 15 Apr, 2024
Design, Manufacture, Testing, Supply, Installation And Commissioning Of Plante Type 110 V Dc, 55 Cells - Each 2V, 100 Ah Battery Sets Required For Various Stations And Buy Back Of Released Battery Sets
#TBD : 31556470
0 Days Left
Power Plant
Karnataka
Ref. Document
Due on : 30 Mar, 2024
Design, Manufacture, Testing, Supply, Installation & Commissioning Of 110 Volts Dc, 100 Ah Capacity Battery Chargers Conforming To Our Technical Specifications, Ford At Store / Site Basis, Including Insurance And Transportation. The 110V Battery Chargers Are To Be Delivered To The Destinations Within Hescom Jurisdiction
#TBD : 31556477
0 Days Left
Power Plant
Karnataka
Ref. Document
Due on : 15 Apr, 2024
Manufacture & Supply Of 11Kv Dolo Cut Out As Per Technical Specification.
#TBD : 31537140
0 Days Left
Power Plant
Karnataka
3.03 Crore
Due on : 12 Apr, 2024
Energisation Of Ganga Kalyana Ip Set Installations And Dws Installations By Creating Necessary Infrastructure 11Kv Lines, Lt Lines And Erection Of Distribution Transformer Centers On Rate Contract Ttk Basis And Lump Sum Basis In O&M Division