#TBD : 34599852
0 Days Left
Power Plant
Haryana
4.88 Lacs
Due on : 10 Jun, 2025
Special Estimate For Strengthening Of Gantry No.51 And 52 Foundations / Stub Repairing Of 132Kv Uklana Dablain Line Under Ae Tl Mtc. Gang, Hvpnl, Tohana During The Year 2024-25.
#TBD : 34599664
0 Days Left
Power Plant
Haryana
2.95 Lacs
Due on : 12 Jun, 2025
Augmentation Of 132 Kv Substation Dadri-1 From 1X16/20 Mva, 132/11 Kv Plus 1X20/25 Mva, 132/33Kv Plus 1X8/4/4 Mva, 132/33/3.3Kv T/Fs To 1X16/20 Mva, 132/11 Kv Plus 2X20/25 Mva, 132/33 Kv T/Fs At 132 Kv S/Stn Charkhi Dadri -1. Augmentation Of 132 Kv Subs...
#TBD : 34599945
0 Days Left
Power Plant
Haryana
1.75 Lacs
Due on : 12 Jun, 2025
Installation Of 10.872 Mvar 33Kv Capacitor Bank On 132/33 Kv, 40/50 Mva T/F T-1 At 132 Kv S/Stn. Odhan- Erection Charges 11/Xen/Ts/Srs/2025-26 Installation Of 10.872 Mvar...
#TBD : 34599419
0 Days Left
Power Plant
Haryana
14.04 Lacs
Due on : 12 Jun, 2025
Shifting/Raising Height Of 220 Kv Pgcil Matana - Sirsa Line Between Tl No. 204 And Tl No. 205 With 0.40 Sqinch Acsr Zebra Condutor At Fatehabad - Ratia Road 12/Xen/Ts/Srs/2025-26 Shifting/Raising Height Of ...
#TBD : 34599775
0 Days Left
Power Plant
Haryana
13.53 Lacs
Due on : 09 Jun, 2025
Replacement Of 1X10/16Mva, 132/11Kv T/F With 1X20/25 Mva, 132/33Kv T/F At 132Kv S/Stn. Kariwala By Hvpnl - Erection Charges 09/Xen/Ts/Srs/2025-26 Replacement Of 1X10/16Mva, ...
#TBD : 34599925
0 Days Left
Power Plant
Haryana
33.35 Lacs
Due on : 12 Jun, 2025
Special Arrangement For Flood Control Measures And Other Allied Civil Works At 132 Kv Sub Station Jind Old.. Special Estimate For Flood ...
#TBD : 34599867
0 Days Left
Power Plant
Haryana
Ref. Document
Due on : 12 Jun, 2025
Hiring Of 01 Nos. Trucks 7-Ton Capacity Through Outsourcing Under Ts Division Hvpnl Yamuna Nagar. Enit-01/Tsynr/2025-26 Dated 26.05.2025
#TBD : 34599626
0 Days Left
Power Plant
Haryana
1.98 Lacs
Due on : 09 Jun, 2025
Repairing And Maintenance Of Bitumen Road In Yard At 66 Kv S/Stn Bhora Kalan Under Ts Division Manesar Work Of Repair And Maintena...
#TBD : 34599576
0 Days Left
Power Plant
Haryana
1.30 Crore
Due on : 09 Jun, 2025
Construction Of Boundary Wall At 132 Kv Sub Station Dharsul. Construction Of Boundary Wa...
#TBD : 34599724
0 Days Left
Power Plant
Haryana
8.36 Lacs
Due on : 16 Jun, 2025
Transportation Of 02 No. 12.5 16Mva, 66 11Kv Power Tfs From 02 Different Locations Work Sites To Under Construction 66Kv Sstn. Jaindapur By Hiring Low Bed Trailer Including Loading And Unloading.