#TBD : 35166671
9 Days Left
Industrial Development Agencies
Haryana
20.57 Lacs
Due on : 01 Sep, 2025
Work Of Construction Of Cc Road Infront Of Plot No 95 To 98, Phase-1, Udyog Vihar, Gurugram. Work Of Construction Of Cc ...
#TBD : 35026279
0 Days Left
Industrial Development Agencies
Haryana
21.17 Lacs
Due on : 11 Aug, 2025
Construction Of Footpath In Front Of Plot No- 15a To Plot No-20, Gurugram Package Company And Plot No-24 Side To Plot No-34 Side In Sector-34-35, Udyog Vihar Phase-vii
#TBD : 35166821
3 Days Left
Industrial Development Agencies
Haryana
4.95 Lacs
Due on : 26 Aug, 2025
Construction Of Damaged Road By Flexible Pavement In Side Of Plot No-59, Sector-35, Phase-vii, Udyog Vihar, Gurugram Construction Of Damaged Roa...
#TBD : 35146235
10 Days Left
Industrial Development Agencies
Haryana
7.23 Crore
Due on : 02 Sep, 2025
Design Manufacture Supply Erection Testing And Commissioning Of 2x12.5 Mva 33/11kv Indoor Substation B Including 33kv Extended Line At Ph Iii Imt
#TBD : 35148893
11 Days Left
Industrial Development Agencies
Haryana
82.55 Lacs
Due on : 03 Sep, 2025
Upgradation Of Street Light System At Sector- 16 17 And 4b Ie Bahadurgarh.
#TBD : 35166929
2 Days Left
Industrial Development Agencies
Haryana
4.10 Lacs
Due on : 25 Aug, 2025
Repairing Of Roads In Sector-18hsvp And Phase-iv, Udyog Vihar, Gurugram Repairing Of Roads In Secto...
#TBD : 35131423
0 Days Left
Industrial Development Agencies
Haryana
11.64 Lacs
Due on : 20 Aug, 2025
Repairing Of Raw Water Tank At Various Location At Water Treatment Plant In Hsiidc, Imt Bawal.
#TBD : 35130604
0 Days Left
Industrial Development Agencies
Haryana
10.63 Lacs
Due on : 20 Aug, 2025
Development Of Green- Belt In Sector-7 At Imt Bawal.
#TBD : 35166518
2 Days Left
Industrial Development Agencies
Haryana
4.98 Lacs
Due on : 25 Aug, 2025
De-silting/cleaning Of Storm Water Drainage Line From Node No-2 To 19 And From Node No-19 To 20 In Sector-34-35, Udyog Vihar, Phase-vii, Gurugram De-silting/cleaning Of Stor...
#TBD : 35040047
0 Days Left
Industrial Development Agencies
Haryana
6.25 Crore
Due on : 19 Aug, 2025
Design, Manufacturing, Supply, Erection, Testing And Commissioning Of Electrical Plus Civil Work For 2X12.5 Mva, 33/11 Kv Indoor Substation At Ie Narwana Haryana On Turnkey Basis.