#TBD : 35149892
0 Days Left
Construction
Haryana
1.52 Lacs
Due on : 22 Aug, 2025
Providing And Installation Of Height Barrier At Mahavir Chowk, Gurugram. District Road Safety Committee Agenda No. 12 Of April 2025. Providing And Installation ...
#TBD : 34936047
0 Days Left
Construction
Haryana
15.09 Lacs
Due on : 01 Aug, 2025
Plantation Of Trees And Shrubs Required In Greenbelts And Maintenance Of Existing Trees, Shrubs And Lawn Including Newly Planted Plants For 01 Year. Plantation And Maintenance Of Greenbelts Of Asset Id 46, 47, 48, 92, 120 Gurugram On Road Old Delhi Road To T Point Sec. 21, 22, T Point Sec. 21, 22 To T Point Tdl Park, Rezangla Chowk To Old Delhi Road To Nh48, Rejangla To Krishna Chowk
#TBD : 35030559
0 Days Left
Construction
Haryana
1.39 Crore
Due on : 11 Aug, 2025
Horticulture Works Plantation And Maintenance Work. Plantation And Complete Maintenance Of The Entire Features Related To Horticulture Works In Green Belt And Central Verges Of Sector Dividing Roads At Asset Id 51, 54, 32, 38, 31, 35, 33 And 42 Gmda
#TBD : 35031272
0 Days Left
Construction
Haryana
166.96 Crore
Due on : 20 Aug, 2025
Construction Of 100 Mld Mps, 100 Mld Stp Along With Bio-cng Plant And Oandm For 10 Years After Completion Of 1 Year Defect Liability Period At, Dhanwapur
#TBD : 34962483
0 Days Left
Construction
Haryana
12.10 Crore
Due on : 18 Aug, 2025
Desilting Of Existing Master Sewer Line 450mm, 600mm, 750/800mm, 900mm, 1350mm, 1600mm And 1800mm And Rehabilitation Of Part Length Of Existing Deteriorated Master Sewer Line Of Size 1600mm And 1800mm
#TBD : 34962867
0 Days Left
Construction
Haryana
97.65 Crore
Due on : 01 Aug, 2025
Design, Construction, Erection, Testing And Commissioning Of 665.5 Mld Capacity Main Pumping Station
#TBD : 34945038
0 Days Left
Construction
Haryana
Ref. Document
Due on : 19 Aug, 2025
Replacement Of Flow Meters Level Sensors Etc. On Gmda Water Pipeline
#TBD : 34937178
0 Days Left
Construction
Haryana
2.26 Crore
Due on : 13 Aug, 2025
Bituminous Main Carriageway, Surface Drain, Road Marking And Furniture Item Etc. Construction Of Missing Link Of Sector Dividing Road 88/89, Gurugram And All Other Works Contingent Thereto
#TBD : 35145992
2 Days Left
Construction
Haryana
1.39 Crore
Due on : 25 Aug, 2025
Horticulture Works Plantation And Maintenance Work. Plantation And Complete Maintenance Of The Entire Features Related To Horticulture Works In Green Belt And Central Verges Of Sector Dividing Roads At Asset Id 51, 54, 32, 38, 31, 35, 33 And 42 Gmda
#TBD : 34934608
0 Days Left
Construction
Haryana
4.87 Crore
Due on : 13 Aug, 2025
Construction Of Missing Link Of Master Sector Dividing Road 62/65, Construction Of Main Carriageway, Service Road, Surface Drain.