#TBD : 34434509
1 Days Left
Construction
Haryana
2.13 Lacs
Due on : 02 May, 2025
Dismantling Of Hard Rocks From Rd 3900 To 4000 At Spr, Gurugram Dismantling Of Hard Rocks F...
#TBD : 34256951
0 Days Left
Construction
Haryana
43.02 Lacs
Due on : 31 Mar, 2025
Special Repair Of Geeta Chownk Rotary Sec-5, 6, 7, 8 Including Special Repair Of Water Fountain, Civil Work And Running Operation Maintenance And Watch And Ward For 12 Month Complete In All Respect As Per Site Requirement
#TBD : 34385897
0 Days Left
Construction
Haryana
Ref. Document
Due on : 01 May, 2025
Providing Consultancy Services For Preparation Of Dpr/dnit For Construction Of Cetp Of 20 Mld At Sector-34, Gurugram
#TBD : 34385364
0 Days Left
Construction
Haryana
Ref. Document
Due on : 01 May, 2025
Providing And Laying Of 2000mm Dia Rcc Np3 Pipe Lines And 500mm Dia Pipe Lines And Construction Of M.hs Etc. Complete In All Respect. Shifting Of Balance Master ...
#TBD : 34386096
0 Days Left
Construction
Haryana
119.31 Crore
Due on : 23 Apr, 2025
Construction Of Rcc Master Storm Water Drain Of Various Size Of Total Length 18320.00 Mtr Construction Of Rcc Box Typ...
#TBD : 34337276
0 Days Left
Construction
Haryana
Ref. Document
Due on : 24 Apr, 2025
Rehabilitation Of Existing Deteriorated Master Sewer Line With Cipp Technology Of Various Sizes From 600mm To 1000mm Dia Rehabilitation Of Existing ...
#TBD : 34320075
0 Days Left
Construction
Haryana
17.43 Crore
Due on : 18 Apr, 2025
Providing And Laying Of 1500mm And 1600mm I/d M.s. Pipe And 1800mm I/d M.s. Casing Pipe Through Trenchless And 700mm I/d D.i Pipe Line
#TBD : 34434597
11 Days Left
Construction
Haryana
53.99 Crore
Due on : 12 May, 2025
Designing, Constructing, Testing, Commissioning, Operation And Maintenance For 5 Years After 12 Months Defect Liability Period For Construction Of Unit-vi At Existing Water Works Comprising 100 Mld Automated Water Treatment Plant, Clear Water Reservoir For 100 Mld, Raw Water And Clear Water Pumping Machinery, Mechanical Dewatering Of Sludge, Pre And Post Chlorination, Lowering Of Sub Soil Water Table, Scada And All Other Works Contingent There To Complete In All Respects On Turn Key Basis For Gmda At Village Chandu Budhera, District Gurgaon, Haryana
#TBD : 34319838
0 Days Left
Construction
Haryana
59.64 Crore
Due on : 18 Apr, 2025
Upgradation Of Existing 100 Mld Sewerage Treatment Plant And Construction Of 75 Mld Tertiary Treatment Unit At Dhanwapur Sewage Treatment Works With Operation And Maintenance For 5 Years After 12 Months Defect Liability Period For Reuse Of Treated Ef
#TBD : 34386709
7 Days Left
Construction
Haryana
Ref. Document
Due on : 08 May, 2025
Providing Consultancy Services For Preparation Of Dpr/dnit For Construction Of Stp Of 100 Mld At Sector-107, Gurugram