#TBD : 31233120
0 Days Left
Construction
Punjab
65.30 Lacs
Due on : 11 Mar, 2024
Maintenance Of Open Spaces And Road Side Plantation In Sector 32 A Sector 33 Central Park And Green Belt In Ews Pocket Sector 32 Samrala Road For The Period From 01 April 2024 To 31 March 2025
#TBD : 31292685
0 Days Left
Construction
Punjab
54.48 Lacs
Due on : 14 Mar, 2024
Sweeping Of Roads Kerbs Channels Removal Of Rubbish And Disposal Of The Same At Near By Approved Garbage Collection Centre Of Municipal Corporation Ludhiana In Urban Estate Phase 3 And 200 Feet Wide Road Dugri Road Ludhiana From 01.04.2024 To 31.03
#TBD : 31292419
0 Days Left
Construction
Punjab
9.89 Lacs
Due on : 14 Mar, 2024
Sweeping Of Roads And Disposal Of All Sweeped Debries From Road Site To Dump Premises And Lifting From Site Dump To Mc Dump With Trolly On Alternative Day Basis With Entire Satisfaction Of Engineer In Charge In Housing Board Colony From 01.
#TBD : 31469215
0 Days Left
Construction
Punjab
22.75 Lacs
Due on : 26 Mar, 2024
House Keeping Services In Puda/Glada Zonal Office At Ferozepur Road From 01.04.2024 To 31.03.2025.
#TBD : 31125394
0 Days Left
Construction
Punjab
1.30 Crore
Due on : 04 Mar, 2024
Sweeping Of Roads Kerbs Channels Removal Of Rubbish And Disposal Of The Same At Near By Approved Garbage Collection Centre Of Municipal Corporation Ludhiana In Urban Estate Sector 32 A And Sector 33 Samrala Road Ludhiana From 01.04.24 To 31.03.25
#TBD : 31235440
0 Days Left
Construction
Punjab
77.04 Lacs
Due on : 11 Mar, 2024
Maintenance Of Plantation In Phase Iii And 200 Feet Road Byepass And Missing Link 1 And 2A And 2B 200 Feet Byepass Dugri Glada Heights Dhandra Road Reserve Commercial Road Pockets Of Phase I And Ii And Iii Dugri Glada House Phase 1 Dugri And Glada
#TBD : 31233955
0 Days Left
Construction
Punjab
77.89 Lacs
Due on : 11 Mar, 2024
Maintenance Of Open Spaces And Road Side Plantation In Sector 39 A Sector 40 100 Sq Yards Pocket In Sector 38 Green Belt At Glada Nursery And Park In Dhandari Kalan Phase-4 Samrala Road Ludhiana For The Period From 01 April 2024 To 31 March 2025
#TBD : 31487052
0 Days Left
Construction
Punjab
Ref. Document
Due on : 26 Mar, 2024
Hiring Of 02 Nos Vehicles On Monthly Basis For The Period 36 Months Maruti Ertiga Or Maruti Xl6 Including Driver And Comprehensive Maintenance Etc For Glada
#TBD : 31125177
0 Days Left
Construction
Punjab
66.03 Lacs
Due on : 04 Mar, 2024
Providing Storm Water Drainage In Front Of Main Gurudwara Sahib Sector-32A And Replacement Of Damaged Existing Storm Water Drainage Of 36 Inch Dia In Fornt Of House No 1775 To House No. 2192 Sector 32 A Samrala Road Ludhiana.
#TBD : 31288458
0 Days Left
Construction
Punjab
13.84 Lacs
Due on : 11 Mar, 2024
Recarpeting Of 60 Feet Wide Road Between Multiplex Shopping Centre Site And Nursing Home Site Of Commercial Reserve Pocket Abutting 100 Feet Wide Sector Road Dugri Road Towards Gne College In Urban Estate Phase 1, Dugri Road, Luhdiana.