#TBD : 34287660
0 Days Left
Power Plant
Goa
Ref. Document
Due on : 07 Apr, 2025
Design Supply Installation Testing Commissioning Of 130kwp Grid Connected Solar Pv Power Plant On The Roof Of New Premises Of Inspectorate Of Factories And Boilers Altinho Panaji Goa Including Operation And Maintenance For 5 Years
#TBD : 34337053
0 Days Left
Power Plant
Goa
1.28 Crore
Due on : 11 Apr, 2025
Design Manufacture Supply Installation Testing Commissioning Of Led Based Solar Street Lighting Sytsems 250 Nos Two Arms Model At Desterro In Mormugao Fishermen Houses At Baina And Desterro And 50 Nos Single Arm Model At Fishermen Houses At Baina Mor
#TBD : 34287347
0 Days Left
Power Plant
Goa
Ref. Document
Due on : 07 Apr, 2025
Design Supply Installation Testing Commissioning Of 80kwp Grid Connected Solar Pv Power Plant On The Roof Of Subdistrict Hospital Chicalim Vasco Goa Including Operation And Maintenance For 5 Years
#TBD : 34287663
0 Days Left
Power Plant
Goa
1.28 Crore
Due on : 11 Apr, 2025
Design Manufacture Supply Installation Testing And Commissioning Of Led Based Solar Street Lighting Systems 250 Nos Two Arms Model Desterro In Mormugao Fisherman Houses At Biana And Desterro And 50 Nos Single Arm Model At Fisherman Houses At Biana
#TBD : 34580860
9 Days Left
Power Plant
Goa
20.69 Crore
Due on : 25 Jun, 2025
Design Supply Installation Testing Commissioning Of 700 Numbers Of Standalone Solar Water Pumping Systems Including Annual Maintenance Contract For 5 Years At Various Locations In The State Of Goa
#TBD : 33783326
0 Days Left
Power Plant
Goa
Ref. Document
Due on : 31 Jan, 2025
Design Supply Installation Testing Commissioning Of 10Kwp Grid Connected Solar Pv Power Plant On The Ground Mounted And 20 Numbers Of 20W Solar Street Lights Including Operation Maintenance For 5 Years At Irbn Police Camp Chandreshwar Sanguem Goa
#TBD : 34288469
0 Days Left
Power Plant
Goa
Ref. Document
Due on : 07 Apr, 2025
Design Supply Installation Testing Commissioning Of Aggregated Capacity Of 85kwp Grid Connected Solar Pv Power System Including Operation And Maintenance For 5 Years
#TBD : 34083871
0 Days Left
Power Plant
Goa
Ref. Document
Due on : 10 Mar, 2025
Design Supply Installation Testing Commissioning Of Aggregated Capacity Of 100Kwp Grid Connected Solar Pv Power Plant On The Rooftop Of Various Building Of Electricity Department Including Operation And Maintenance For 5 Years
#TBD : 34588288
0 Days Left
Power Plant
Goa
15.00 Lacs
Due on : 13 Jun, 2025
Supply Installation And Commissioning Of 600 Sq. Ft. Polycarbonate Cladded Hybrid Solar Tunnel Drier Of Size 18 Ft. Width X 33 Ft. Length X 8.5 Ft. Height Parabolic Shape For Drying Of Various Type Of Food Products In The Premises
#TBD : 33997517
0 Days Left
Power Plant
Goa
Ref. Document
Due on : 27 Feb, 2025
Design Supply Installation Testing Commissioning Of 125Kwp Grid Connected Solar Pv Power Plant On The Roof Of Ravindra Bhavan Sankhali Sankhali Goa Including Operation And Maintenance For 5 Years