#TBD : 34432696
1 Days Left
Construction
Haryana
4.24 Crore
Due on : 02 May, 2025
Master Storm Water Drainage Scheme, Faridabad- Desilting, Cleaning And Repair Of Master Storm Water Line On Dividing Roads Of Various Sectors Of Old Faridabad Constituency Mainly In Sec- 11-12, 10-12, 9-13, 9-10 Dividing Road 15a- 16a, 15-16, 14-17
#TBD : 33566131
0 Days Left
Construction
Haryana
26.89 Crore
Due on : 31 Dec, 2024
Operation And Maintenance Of Master Ranney Well Line No.1 To 8 Including 22 No. Ranney Wells, 160 No. Tube Wellsapp, 8 No. Main Boosting Stationsmbs, 5 No. Intermediate Boosting Stationsibs, 3 No. Online Boosters And 2 No. Tube Wells Booster Al Master W/S Scheme
#TBD : 34261752
0 Days Left
Construction
Haryana
6.29 Crore
Due on : 08 Apr, 2025
Asset Id 1071 Is A Master Road Having 30 Mtr Row Is An Important Road Which Connects Ymca Mathura Road To Bypass Road. This Work Has Length Of 2250 Mtr Out Of Which 1450 Mtr Is Newly Developed And Constructed Recently. 850 Mtr Of Length Which Compris Development And Execution O
#TBD : 33964719
0 Days Left
Construction
Haryana
Ref. Document
Due on : 24 Feb, 2025
Supply of High End Laptop - Notebook (Q2) , Multifunction Machine
MFM (V2) (Q2) , Line Interactive UPS with AVR (V2) (Q2)
#TBD : 33888150
0 Days Left
Construction
Haryana
113.53 Crore
Due on : 10 Feb, 2025
Making Of Thermoplastic, Fixing Of Road Stud, Delineators Etc. For Road Safety On Various City Master Road
#TBD : 33666770
0 Days Left
Construction
Haryana
15.37 Lacs
Due on : 07 Jan, 2025
Landscaping, Horticulture And Maintenance Works At Asset Id 1064, Fmda, Faridabad. Renovation And Maintenance Of Horticulture Works Of Dividing Road Sector 12, 13 Dividing 15, 14 Fmda Asset Id 1064 Faridabad
#TBD : 33567238
0 Days Left
Construction
Haryana
26.84 Crore
Due on : 31 Dec, 2024
Supply, Installation, Testing And Commissioning Of Water Screen-Based Sound And Light Show At Badkhal Lake, Faridabad And All Other Works Contingent Thereto. Including 5 Year Comprehensive Oandm With 02-Year Defect Liability Period
#TBD : 33586685
0 Days Left
Construction
Haryana
Ref. Document
Due on : 26 Dec, 2024
Providing House Keeping Services Including Front Desk And Other Staff, Facility Management Services Viz. Mechanized House Keeping, Management Of Front Office, Reception, Maintenance And Provision Of Manpower In Fmda Faridabad For The Year 2024-2025
#TBD : 34321134
0 Days Left
Construction
Haryana
2.82 Crore
Due on : 21 Apr, 2025
Desilting And Reconstruction Of Existing Drain From B.k Chowk To Railway Line Via Neelam Chowk And Desilting Of Gaunchi Drain/ Ac Nagar Nala From Neelam Flyover To Mujesar Phatak And All Other Works Contingent Thereto. Master Drainage Scheme
#TBD : 33449505
0 Days Left
Construction
Haryana
24.75 Lacs
Due on : 07 Dec, 2024
Cleaning Of Sewer Lines With Bucket Type Sewer Machine In Partapgarh For The Period Of One Year Master Sewerage Scheme Fari...