#TBD : 34197283
0 Days Left
Power Plant
Tamil Nadu
24.70 Lacs
Due on : 21 Mar, 2025
Upkeep And Maintenance Of Inspection Bunglow At Baratang Under Cd-I, Rangat During 2023-24. Sw - Up-Keeping And Running Of Inspection Bunglow At Bartang Under Sub Division No. Iii Of Cd-I, Apwd, Rangat.
#TBD : 34197289
0 Days Left
Power Plant
Tamil Nadu
10.33 Lacs
Due on : 19 Mar, 2025
Collection And Supplying Of Drinking Water Through Water Tanker Fitted With Water Pump And Water Meter Of Required Horse Power And Dia Respectively Under Sd-Ii, Cd-I, Rangat - As And When Required Basis.
#TBD : 34197275
0 Days Left
Power Plant
Tamil Nadu
Ref. Document
Due on : 27 Mar, 2025
Demolition And Disposal Of Forest Corporation 08 Nos Type-I Qtrs At Haddo Under Chatham Section Of Sd-Ii, Svpnd, Apwd, Sri Vijaya Puram Without Land
#TBD : 34196685
0 Days Left
Power Plant
Rajasthan
9.98 Lacs
Due on : 28 Mar, 2025
Maintenance Of Different L.I And D.T.W Schemes Under W.R Sub Division No I, Kailashahar Of Chandipur Block During The Year 2024 25 Sh Repairing Of Pump Motor, Panel Board, Suction Line And Delivery Line Etc And Rewinding Of Motors. Gr-Ii
#TBD : 34206502
0 Days Left
Power Plant
Kerala
21.24 Lacs
Due on : 20 Mar, 2025
Earthwork Gsb Cc M15 M20 And Steel Reinforcement Works General Deposit Work Urgent Re Construction Of Damaged Culvert At Kallige Komanglam Kurudappadavu Road At Chainage 0800 General Sr General
#TBD : 34197342
0 Days Left
Power Plant
Kerala
46.55 Lacs
Due on : 20 Mar, 2025
Sw- Wheel Valve Operation And Maintenance Of Water Supply Pipeline Network As An When Required Under Swarajgram Section Under Water Supply Sd-Ii For 01 Year From April 2025 To March 2026 Ar And Mo Water Supply Under Sd-Ii, Cd, Apwd, Diglipur During 2025-26.
#TBD : 34208771
0 Days Left
Power Plant
Kerala
3.14 Lacs
Due on : 20 Mar, 2025
General-Investigation Work-Madakkara-Thazhathoor-Cheeral Road Mdr Between Ch 0-800 Km And 0-900 Km General-Investigation Work-Madakkara Thazhathoor Cheeral Road
#TBD : 34197518
0 Days Left
Power Plant
Tamil Nadu
5.81 Lacs
Due on : 21 Mar, 2025
Ar And Mo Non Residential Building Under Sd-I, Cd-I, Apwd, Rangat. Sw - Upkeeping And Maintenance Of Inspection Bunglow At Rangat.
#TBD : 34194450
0 Days Left
Power Plant
Karnataka
29.74 Lacs
Due on : 25 Mar, 2025
Repair And Restoration Work Of Chandpur Canal And Guls Under Yamnotri Vidhansabha Of Bhatwadi Block Distt-Uttarkashi Reach -0.00 Mtr To 2000 Mtr
#TBD : 34197279
0 Days Left
Power Plant
Tamil Nadu
24.70 Lacs
Due on : 21 Mar, 2025
Upkeep And Maintenance Of Inspection Bunglow At Baratang Under Cd-I, Rangat During 2023-24. Sw - Up-Keeping And Running Of Inspection Bunglow At Bartang Under Sub Division No. Iii Of Cd-I, Apwd, Rangat.