#TBD : 35089207
4 Days Left
Railway Transport
Uttar Pradesh
14.51 Crore
Due on : 27 Aug, 2025
Track Maintenance Of Double Line Bg Track Including Dfccil Yards, Link Line, Formation And Others Works Between Gaqn Station Approx. Ch-110+000 To Undn Approx. Ch-236+300 Of Section Of Ddu Unit Of Eastern Dedicated Freight Corridor.
#TBD : 33773709
0 Days Left
Railway Transport
Uttar Pradesh
1.88 Crore
Due on : 05 Feb, 2025
Maintenance Of Staff Quarters, Imsd/Imd, Station Buildings And Other Service Buildings Including Minor Civil Works In Between New Karchhana To New Bhaupur Section Of Cgm/Pryj W Unit Of Edfc.
#TBD : 34986094
0 Days Left
Railway Transport
Uttar Pradesh
7.50 Crore
Due on : 18 Aug, 2025
Construction Of Retaining Wall, Toe Wall & Longitudinal And Chute Drains Under Imd Krjn Section Between Km 683 To 851 Under Cgm/tundla Unit Of Edfc.
#TBD : 34985388
0 Days Left
Railway Transport
Haryana
57.54 Lacs
Due on : 20 Aug, 2025
Balance Work Of Lhs At Level Crossing No. 168 & 144 On Edfc Route Umb-Snl In The Unit Of Cgm/Dfccil/Umb.
#TBD : 34671197
0 Days Left
Railway Transport
Uttar Pradesh
2.89 Crore
Due on : 27 Jun, 2025
Hiring Of Manpower For Maintenance Of General Power Supply E&m Assets Of Various Station Buildings-new Unchdih, New Mirzapur, New Dagmagpur, New Ahraura & New Ddu, Imd, Imsd, Service Buildings Along With Supply Of Listed Material For A Period Of 24 Twenty-four Months In Undn-ddun Section Under Cgm/ddu Unit Of Dfccil
#TBD : 34673056
0 Days Left
Railway Transport
Uttar Pradesh
7.24 Crore
Due on : 07 Jul, 2025
Repair Of Rain Cut In Embankment/formation, Turfing, And Other Allied Works Between New Kanpur To New Bhaupur Section Dfc Chainage 462.000 Km To 507.670 Km, Under Jurisdiction Of Cgm/pryj
#TBD : 34609662
0 Days Left
Railway Transport
Chandigarh
14.97 Crore
Due on : 13 Jun, 2025
Usfd Testing Of Rails And Welds As Per Indian Railway Manual For Ultrasonic Testing Of Rails And Weld Revised 2022 Of Double Line Track In New Khurja To New Bhaupur Section Between Dfc Km 851.300 To Km 514.00, Including Yard And Ir Connection Of Dfccil For Two Years In Edfc Under Cgm/tundla.
#TBD : 33799760
0 Days Left
Railway Transport
Assam
Ref. Document
Due on : 28 Jan, 2025
Broiler Alive, Eggs, Veg Fresh, Fruit Fresh, Potato, Onion, Garlic, Ice Mm, Bread Ww And Bread White Tez/2025-26/Baguri Comb/St-5
#TBD : 34993632
0 Days Left
Railway Transport
Haryana
2.58 Crore
Due on : 22 Aug, 2025
Demarcation Of Surplus Acquired Dfccil Land Of Row With Pre-cast R.c.c.m20 Posts With Barbed Wire Fencing 3m Apart And Dismantling & Disposal Of Relapsed Materials Of Dismantled Structures Falling In Khurja-pilkhani Section.
#TBD : 33773689
0 Days Left
Railway Transport
Haryana
32.57 Lacs
Due on : 21 Jan, 2025
Construction Of Cctv Control Office / Room At Ambala Cantt In The Unit