#TBD : 31565012
41 Days Left
Road Work
Assam
29.70 Crore
Due on : 10 May, 2024
Design And Construction Of Technical And Administrative Infrastructure For Ebw And Esd At Under Project Vartak In State
#TBD : 31553147
16 Days Left
Road Work
Delhi
5.00 Crore
Due on : 15 Apr, 2024
Design And Construction Of 70 Mtr Span Steel Superstructure Through Type Major Pmt Bridge On Departmentally Constructed Abutment Over Tamunti Nallah At Km 1.744 On Road Karoti-Tenai Of 1444 Bcc Sector Under 48 Brtf In Arunachal Pradesh
#TBD : 31556967
33 Days Left
Road Work
West Bengal
1.38 Crore
Due on : 02 May, 2024
Engaging Technical Consultant For Preparation Of Of Feasibility Study Fs And Detailed Project Report Dpr For Construction Of Road Nampong-Vijaynagar From Km 30.00 To Km 100.00Net Length Of Road 70.00 Km To Nhdl Specifications Under 103 Rcc/752
#TBD : 31548703
14 Days Left
Road Work
Arunachal Pradesh
Ref. Document
Due on : 13 Apr, 2024
Supply of 18019 Explosives Q3 Detonating Fuse Q3
#TBD : 31552787
14 Days Left
Road Work
Sikkim
1.70 Crore
Due on : 13 Apr, 2024
Providing, Laying, Spreading And Comp Of 40 Mm Consolidated Bc Incl Tack Coat And Correction Work With Bc Including Tack Coat Along With Road Marking Resurfacing Works Between 0.00 To Km 4.800 On Road Gangtok Chungthang Under 129 Rcc In 758 Brtf Are
#TBD : 31548720
16 Days Left
Road Work
Delhi
36.80 Lacs
Due on : 15 Apr, 2024
Handling And Conveyance Of Modular Non-Insulated Containerised Living Shelter Size 6.10 Mtr X 2.90 Mtr X 2.44 Mtr From Dett-A Of 504 Ss And Tc At Daranga Samdrup Jongkhar To Various Locations Of 63 Rcc And 64 Rcc Under Part-I Eastern Bhutan
#TBD : 31555093
14 Days Left
Road Work
Uttaranchal
29.05 Crore
Due on : 13 Apr, 2024
Stablisation Of Land Slide And Slope Protection At Km 474.710 To Km 474.850 And Km 475.565 To Km 474.625 On Rishikesh Joshimath Mana Road Nh-07 On Epc Mode In The State Of Uttrakhand
#TBD : 31553438
20 Days Left
Road Work
Sikkim
55.86 Lacs
Due on : 19 Apr, 2024
Supply And Stacking Of Crushed Stone Aggregates Of Various Sizes And Stone Dust Dry At Km 10.50 Hmp Site On Tamze Gen Area Pt 4685 Road Between Km 0.000 To 5.500 For Bc 40 Mm Including Correction Works And On Road Carpost Dogra Lake Between Km 0.
#TBD : 31564932
18 Days Left
Road Work
West Bengal
23.97 Lacs
Due on : 17 Apr, 2024
Supply And Stacking Of S/Agg V/Sizes And S/Dust Dry At Km 71 Hmp Site On D-A-R Rd For Bc 40 Mm For Resurf Wks Fy 2024-25 On Rd R-P Km 0.00-2.91, 18.00-26.00 And On Rd S-D Km 0.405-1.20, 1.40-1.70 And 1.899-2.00 Incl Corr Wks, Udr 87 Rcc/764 Tf P Swtk State Wb/Skm
#TBD : 31555219
6 Days Left
Road Work
Sikkim
8.10 Crore
Due on : 05 Apr, 2024
Supply And Stacking Of Stone Agg And Stone Dust Btw Km 0.00 To Km 33.80 On Fmd Rd For Nfssb And Csb Works And At Km 76.00 On Rrk Rd And Km 8.80 On Bbd Rd For Dbm And Bc Works Btw Km 0.00 To Km 33.80 On Fmd Rd Under 130 Rcc 764 Brtf In Project Swastik