#TBD : 34581376
4 Days Left
Power
Assam
292.00 Crore
Due on : 23 Jun, 2025
Advancing Term Loan To Meet Capital Expenditure Against Setting Up Of 24 Mw Karbi Langpi Middle-Ii Hydro Power Project Of Apgcl.
#TBD : 34367359
0 Days Left
Power
Assam
Ref. Document
Due on : 01 May, 2025
Geo Technical Sub Soil Investigation For Proposed Lower Kopili 50mw Solar Spv Plant, Apgcl, Longku, Dima Hasao, Assam- 788931 Geo Technical Sub Soil Investigation For Proposed Lower Kopili 50mw Solar
#TBD : 34510664
0 Days Left
Power
Assam
29.44 Lacs
Due on : 10 Jun, 2025
Construction Of A New Staff Toilet, Student Toilet Including Water Supply And Internal Electrification Along With Other Renovation Works At Longku High School Under Lad Scheme Of 120 Mw Lkhep, Longku, Dima Hasao
#TBD : 34510908
0 Days Left
Power
Assam
Ref. Document
Due on : 16 Jun, 2025
Major Overhauling Of Unit No-2, 1.5 Mw, Francis Type Gugler Make Hydro Turbine Of Myntriang Small Hydro Electric Project Mshep Stage-ii, Apgcl, Lengery
#TBD : 34510947
0 Days Left
Power
Assam
10.00 Crore
Due on : 13 Jun, 2025
Request For Expression Of Interest Eoi For Technical Upgradation Of 2x50 Mw Unit 1 And 2 Of Klhep, Apgcl With State-of-the-art Digital Governor System, Control System, Microprocessor Based Electrical Protection System And Excitation System
#TBD : 34485593
0 Days Left
Power
Assam
27.39 Lacs
Due on : 04 Jun, 2025
A Erection Of Pole To Install The Ews U/s Of Klhep, Apgcl, Lengery B Construction Of Boundary Wall Around Security Cabin And Ews Monitoring Room Of Klhep, Apgcl, Lengery C Construction Of Security Room Along With Ews Maintenance Room U/s Of Klh
#TBD : 34631330
7 Days Left
Power
Assam
48.66 Lacs
Due on : 26 Jun, 2025
A Repairing And Widening Of Borluit Path Left Side From Main Entrance Gate To Gm Office Security Gate At Ntps. B Repairing Of Borluit Path From Gm Office Security Gate To Solar Project Site Entrance Gate, Ntps, Apgcl. Repairing And Widening Of Borluit Path At Ntps, Apgcl
#TBD : 34367037
0 Days Left
Power
Assam
Ref. Document
Due on : 02 May, 2025
Supply Of Materials At Phase Ii Power House Of Lakwa Thermal Power Station Ltps, Apgcl, Maibella. Ii. Repair And Refurbishment Of A Gt Rotor And Other Works. Major Inspection Along With Other Works Of Gt Unit 6 Of Ltps
#TBD : 34436285
0 Days Left
Power
Assam
57.40 Lacs
Due on : 14 May, 2025
Development, Installation And Commissioning Of 2two Nos. Of Deep Tubewell Including Storage Tank And Filtration Unit At Namrup Thermal Power Stationntps, Apgcl, Namrup
#TBD : 34510550
0 Days Left
Power
Assam
Ref. Document
Due on : 09 Jun, 2025
Monitoring And Verification Mv Assessment 2024-25 Of Lakwa Thermal Power Station In Compliance With Perform Achieve And Trade Pat Scheme For The Pat Cycle Vii 2022-23 To 2024-25.