Construction Of 35 Nos. 125mm X 40mm Dia. X 61 Meter Deep Hand Operated T/well And 15 Nos. Of 125mm X 45 Meter Deep Gravel Packed Tube Well With India Mark Ii Hand Pump And Construction Of 1.85 Mtr. Dia, Circular P.c.c. Platform And 3.00 Mtr P.c.c. Drain At The Place Of Defunct Hp Of As Per Requirements