Overhauling Of 5000 Gph Capacity Pressure Filter At Kurja Mine Under Kurja Sub Area.
#TBD : 34441435
25 Days Left
Coal And Lignite
Uttar Pradesh
5.41 Lacs
Due on : 26 May, 2025
Supply Of Ac Spares For Beml Make Bws70 Model Water Sprinklers
#TBD : 34441437
4 Days Left
Coal And Lignite
Uttar Pradesh
5.67 Lacs
Due on : 05 May, 2025
Repair Or Rewiring Work Of Electrical Panels And Circuit Of Pandh-i Exc-1282 Electrical Rope Shovel At Kakri Project.
#TBD : 34441439
5 Days Left
Coal And Lignite
Jharkhand
Ref. Document
Due on : 06 May, 2025
Maintenance Of 11kv, 3.3kv And 440v Overhead Line Of Topa Ocp Under Kuju Area.
#TBD : 34441440
4 Days Left
Coal And Lignite
Uttar Pradesh
21.16 Lacs
Due on : 05 May, 2025
Repairing/co-axial Line Boring/machining Work Of A Frame Bearing Housing, Steering Cylinder And Steering Tie Rod Mounting Eye, Rear Suspension Mounting Eye, Hoist Jack Mounting Eye Of 10 Nos Cat 777d/e 100t Dumpers At Nws For A Period Of 01 Years.
#TBD : 34441443
5 Days Left
Coal And Lignite
Madhya Pradesh
2.26 Lacs
Due on : 06 May, 2025
Construction Of Rcc Safety Boards / Caution Boards In Abandoned Mines And Related Prohibited Area Under Burhar Sharda Sub Area
#TBD : 34441444
4 Days Left
Coal And Lignite
Jharkhand
4.83 Lacs
Due on : 05 May, 2025
Laying Of 6 Inch150mm Diameter Pipeline Approx 400m For Mine Dewatering At New Patch Of Potanga Quarry Under Urimari Ocp.
#TBD : 34441447
5 Days Left
Coal And Lignite
Uttar Pradesh
10.14 Lacs
Due on : 06 May, 2025
Modification/upgradation Of One Nos. Existing Electronic In-motion Rail Weighbridge Eimwb Compatible With Hosting Of Application Software Of Eimwb Oems On Railway Cloud At Bina Project
#TBD : 34441450
5 Days Left
Coal And Lignite
Madhya Pradesh
25.38 Lacs
Due on : 06 May, 2025
Replacement Of Damaged Sheet Of Vehicle Stand And Repairing Of Floor At Khairaha And Rajendra Ug Mine Under Rajendra Sub Area
#TBD : 34441451
5 Days Left
Coal And Lignite
Jharkhand
8.71 Lacs
Due on : 06 May, 2025
Laying Of Water Supply Pipeline From Tanker Filling Point Near Coal Stock 44 To Coal Stock 43 44 And 45 At Sec 2 Under Rocp